Date |
Text |
2020-11-06 11:26:37 | BUILDING REVIEW COMMENTS |
| CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. |
| |
| NOTE: |
| BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO |
| MEANS CONTRACTOR WILL SUBMIT REQUIRED INFORMATION AFTER |
| THE PERMIT IS ISSUED BUT BEFORE INSPECTIONS TO AVOID |
| CONFLICTS/DELAYS. REVISION FEES MAY APPLY. CONTRACTOR |
| TO ADVICE IF PROVISO OPTION IS PREFERRED AT THIS TIME |
| OR IF RE-SUBMITTING REQUIRED INFORMATION BEFORE PERMIT |
| ISSUANCE. |
| |
| 1- SECTION 1/S-1: |
| A) DETAIL SHOWS A NEW FASCIA. WITH A NOTE STATING "(N) |
| SHEATHING (SEE ARCH)". THERE ARE NOT ARCHITECTURAL |
| DRAWINGS SUBMITTED. PROVIDE THE ARCHITECTURAL DRAWING |
| WITH COMPLETE SHEATHING SPECIFICATIONS OR PROVIDE |
| COMPLETE SPECIFICATIONS (TYPE, FASTENING, ETC). |
| SEC. 702.6 FBC-EXISTING BUILDING. SEC. 1609.1 |
| FBC-BUILDING. |
| |
| B) DETAIL SHOWS "(E) ROOF COVERING MEMBRANE. (SEE ARCH |
| FOR NEW ROOFING /FLASHING)". THERE ARE NOT |
| ARCHITECTURAL DRAWINGS SUBMITTED. PROVIDE THE |
| ARCHITECTURAL DRAWING WITH COMPLETE ROOFING |
| SPECIFICATIONS OR PROVIDE COMPLETE SPECIFICATIONS |
| (TYPE, FASTENING, ETC). |
| SEC. 702.6 FBC-EXISTING BUILDING. SEC. 1609.1 |
| FBC-BUILDING. |
| |
| 2- CLARIFY NOTE #4 OF EXISTING PARTIAL ROOF FRAMING |
| PLAN. DESIGN PRESSURES SEEM TO BE LOW FOR A BUILDING |
| LOCATED IN EXPOSURE "D" AS SPECIFIED ON WIND LOAD NOTE |
| 1(A) UNDER THE STRUCTURAL NOTES. REVISE/CLARIFY AS |
| REQUIRED. ARE THESE NOMINAL LOADS. ARE THESE THE MAIN |
| WINDFORCE RESISTING FORCES. ARE THESE THESE DESIGN |
| PRESSURES FOR COMPONENTS AND CLADDING?. IF SO SPECIFY |
| THE ROOF ZONES AND THE WALL ZONES. |
| SEC. 702.6 FBC-EXISTING BUILDING. SEC. 1609.1 |
| FBC-BUILDING. SEC. 107.2.1 CITY AMENDMENTS. |
| |
| 3- PRODUCT APPROVALS: |
| A)PROVIDE PRODUCT APPROVAL AS REQUIRED BY FAC |
| 61G20-3.001 FOR FLAT ROOF ASSEMBLY. AND, CLEARLY |
| IDENTIFY THE SPECIFIC ASSEMBLY TO BE INSTALLED. |
| |
| (NOTE: THIS MAY BE SUBMITTED LATER AS A DEFERRED |
| SUBMITTAL. PROVIDE COMPLETE INFORMATION PRIOR TO |
| INSTALLATION TO AVOID CONFLICTS/DELAYS. ALL PRODUCT |
| APPROVALS NEED TO BE APPROVED IN WRITING BY DESIGNER OF |
| RECORD PRIOR TO SUBMITTAL). |
| |
| B) ROOFING SUBMIT REQUIRED. SEC. 105.1 CITY AMENDMENTS. |
| |
| 4-DESIGNER OF RECORD TO REVIEW AND APPROVE IN WRITING |
| (NOT SIGNING AND SEALING) ALL PRODUCT APPROVALS AS |
| REQUIRED BY SEC. 107.3.4.1 CITY AMENDMENTS |
| |
| WHEN RESUBMITTING, A TRANSMITTAL LETTER LISTING THE |
| ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF |
| THE REVISION MADE, IDENTIFYING THE SHEET OR |
| SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL |
| HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR |
| ANTICIPATED COOPERATION. |
| |
| PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| QUESTIONS REGARDING THESE COMMENTS, |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| (561)805-6712 |