Plan Review Notes
Plan Review Notes For Permit 20101335
Permit Number 20101335
Review Stop B
Sequence Number 3
Notes
Date Text
2021-03-31 09:22:19PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
  
 3. WATERING DOWN METHOD IS REQUIRED:
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
 IF A WATER TRUCK WILL BE USED THEN YOU WILL NEED TO
 SUBMIT DETAILS INCLUDING :
 THE GALLON CAPACITY OF THE WATER TRUCK TANK,
 A STATEMENT CONFIRMING THAT POTABLE WATER WILL BE USED
 AND A STATEMENT THAT THE WATER TRUCK WILL BE ON-SITE AT
 ALL TIMES DURING WORK.
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561?822?2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED, (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING #703.
 (3/31/21 STILL PENDING THE PLUMBING FINAL INSPECTION
 FOR PERMIT #21030683)
  
 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF
 THE STRUCTURE(S) TO BE DEMOLISHED, THE IMAGE SUBMITTED
 IS NOT CLEAR. PLEASE RESUBMIT.
  
 8. FBC 107.8. PROVIDE A STORMWATER POLLUTION PREVENTION
 PLAN.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved