Date |
Text |
2020-10-26 11:11:29 | 10/26/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. PLEASE SIZE RETURN ON THE PIPING FOR 1 1/2 PAGE ONE |
| PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1 |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| 2. PLEASE IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS |
| SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL WITH |
| A LINE GRAPH. THIS IS NEEDED TO CONFIRM THE MAXIMUM |
| SYSTEM FLOW FROM THE TDH CALCULATIONS PER THE |
| ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. |
| |
| 3. PLEASE PROVIDE ALL MANUFACTURES SPECIFICATION FOR |
| ALL SYSTEM COMPONENTS ( PUMP, CARTRIDGE FILTER, AND |
| SALT SYS.) THAT ARE USED IN THE POOL PER THE WPB |
| AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| CONSTRUCTION DOCUMENTS. |
| |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |