2021-03-03 08:24:51PLAN
 REVIEW COMMENTS
  
 3RD REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) NOT RESOLVED. [THE OVERALL SITE PLAN DOES NOT SHOW
 THE CHANGES MADE TO AREA 2 WHERE AN ADDITIONAL CHARGING
 STATION WAS ADDED TO COMPLY WITH ACCESSIBILITY.] THE
 RE-SUBMITTED PLANS DO NOT COMPLETELY ADDRESS THE
 ACCESSIBILITY ISSUE. THE SITE PLAN INDICATES THAT THE
 EVC STATIONS ARE LOCATED IN TWO DIFFERENT PARKING AREAS
 WHICH ARE FOR TWO DIFFERENT BUILDINGS. THE AREAS ARE
 NAMED AREA 1 AND AREA 2.
 AREA 1 HAS SIX EXISTING ACCESSIBLE PARKING SPACES AND
 THIS PARKING LOT SERVES THE DIALYSIS CENTER. THERE WILL
 BE A TOTAL OF 5 EV SPACES IN THIS AREA. THE PLAN
 INDICATES THAT AN EVC STATION WILL BE INSTALLED AT ONE
 OF THE EXISTING ACCESSIBLE SPACES. THIS IS ACCEPTABLE.
 AREA 2 HAS EIGHT EXISTING ACCESSIBLE PARKING SPACES AND
 THIS LOT SERVES THE AMBULATORY SURGICAL CENTER. THERE
 WILL BE A TOTAL OF 8 EV SPACES IN THIS AREA. THERE ARE
 NO ACCESSIBLE EVC STATIONS INDICATED ON THE PLANS FOR
 AREA 2. AT LEAST ONE OF THESE CHARGING STATIONS SHOULD
 BE ACCESSIBLE. FBC ACCESSIBILITY CHAPTERS 3, 4 AND 5
  