Date |
Text |
2020-10-02 08:19:30 | 010/02/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED |
| CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| TO THE FBC SEC. 105.1. |
| |
| 2. A SITE PLAN DEPICTING THE GENERAL LOCATION OF THE |
| PROPOSED BACKFLOW PREVENTION DEVICE, THIS CAN BE DONE |
| BY GOING TO THE PROPERTY APPRAISER WEBSITE AND PRINT |
| OUT A STRUCTURAL LAYOUT OF THE BUILDING AND HAND DRAW |
| THE METER LOCATION WITH THE BACKFLOW. |
| |
| 3. TWO COPIES OF THE MANUFACTURER'S SPECIFICATIONS FOR |
| THE BACKFLOW PREVENTER. THE MAKE, MODEL, AND SIZE OF |
| THE DEVICE SHALL BE LISTED IN THE DESCRIPTION OF THE |
| WORK SECTION ON THE PERMIT APPLICATION. |
| |
| 4. DOCUMENTATION THAT THE PROPOSED DEVICE IS LEAD-FREE |
| WHICH CONTAINS NOT MORE THAN 0.2-PERCENT LEAD. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |