Plan Review Notes
Plan Review Notes For Permit 20090742
Permit Number 20090742
Review Stop P
Sequence Number 1
Notes
Date Text
2020-10-02 08:19:30010/02/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 2. A SITE PLAN DEPICTING THE GENERAL LOCATION OF THE
 PROPOSED BACKFLOW PREVENTION DEVICE, THIS CAN BE DONE
 BY GOING TO THE PROPERTY APPRAISER WEBSITE AND PRINT
 OUT A STRUCTURAL LAYOUT OF THE BUILDING AND HAND DRAW
 THE METER LOCATION WITH THE BACKFLOW.
  
 3. TWO COPIES OF THE MANUFACTURER'S SPECIFICATIONS FOR
 THE BACKFLOW PREVENTER. THE MAKE, MODEL, AND SIZE OF
 THE DEVICE SHALL BE LISTED IN THE DESCRIPTION OF THE
 WORK SECTION ON THE PERMIT APPLICATION.
  
 4. DOCUMENTATION THAT THE PROPOSED DEVICE IS LEAD-FREE
 WHICH CONTAINS NOT MORE THAN 0.2-PERCENT LEAD.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved