Date |
Text |
2020-12-17 13:56:55 | PLAN |
| REVIEW COMMENTS |
| 2ND REVIEW: FBC SIXTH EDITION (2017) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) COMPLIED. |
| |
| 2) PARTIALLY ADDRESSED. (SPECIFY THE HEIGHT OF THE |
| POLES. THE POLES ARE REQUIRED TO COMPLY WITH FBC |
| 3105.4.2 DESIGN OF THE STRUCTURAL FRAMING MEMBERS SHALL |
| BE BASED ON RATIONAL ANALYSIS, USING THE APPLICABLE |
| WIND LOADS OF CHAPTER 16 AS SHOWN BELOW: 3105.4.2.1 THE |
| WIND DESIGN LOADS FOR ANY FABRIC OR MEMBRANE-COVERED |
| STRUCTURE DESIGNED WITH A QUICK REMOVAL OR BREAKAWAY |
| MEMBRANE OR FABRIC AT WIND VELOCITIES OF 75 MPH, SHALL |
| BE BASED ON THE FOLLOWING CRITERIA: 1.MINIMUM WIND |
| SPEED 105 MPH 2.EXPOSURE CATEGORY B, C OR D AS DEFINED |
| IN CHAPTER 16.THE POLES WITH THE FABRIC REMOVED ARE |
| REQUIRED TO BE CAPABLE OF WITHSTANDING 170 MPH |
| WINDSPEED IN EXPOSURE C.) SUBMIT SIGNED AND SEALED |
| DRAWINGS FROM A FLORIDA LICENSED DESIGN PROFESSIONAL |
| THAT PROVIDE STRUCTURAL DETAILS FOR THE POLES AND THEIR |
| FOUNDATIONS. SPECIFY THE HEIGHT AND DIMENSIONS OF THE |
| POLES. PROVIDE THE DIMENSIONS OF THE FOUNDATIONS. |
| SPECIFY THE WIND DESIGN DATA ON THE DRAWINGS AND |
| PROVIDE CALCULATIONS. FS 471 OR 481, FBC 107, 1609 & |
| 3105.3 |
| |
| 3) NOT ADDRESSED. (BASED ON THE PLANS IT APPEARS THAT |
| THE SAILS WILL HAVE TO BE REMOVED WHEN THE WIND SPEED |
| IS FORCAST TO EXCEED 75 MPH.) IF THE SHADE SAILS ARE |
| REQUIRED TO BE REMOVED DURING HIGH WIND EVENTS, SPECIFY |
| WHEN THEY ARE TO BE REMOVE AND PROVIDE DETAILED REMOVAL |
| INSTRUCTIONS WITH PHOTOGRAPHS/DRAWINGS THAT SHOW HOW |
| THIS IS DONE IN TERMS THAT A LAYMAN WILL UNDERSTAND. |
| THESE INSTRUCTIONS ARE TO BE PROVIDED TO THE PROPERTY |
| OWNER, OWNER'S REPRESENTATIVE OR LESSEE. FBC 107.2.1 |
| |
| 4) SUBMIT THE FLAME SPREAD EVALUATION FOR THE SHADE |
| SAIL FABRIC. FBC 3105.3.4.1 FABRIC USED FOR AWNINGS OR |
| FABRIC-COVERED FRAMES SHALL MEET THE FLAME PROPAGATION |
| PERFORMANCE CRITERIA OF NFPA 701 OR HAVE A FLAME SPREAD |
| INDEX NOT GREATER THAN 25 WHEN TESTED IN ACCORDANCE |
| WITH ASTM E84 OR UL 723. |
| |
| 5) COMPLIED. |
| |
| 6) THE VALUE OF $100.00 IS LOW FOR THIS PROJECT. FBC |
| 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| |
| 7) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| CITY RE-SUBMITTAL FORM. |
| |
| |
| |
| |
| |