Plan Review Notes For Permit 20090311 |
Permit Number |
20090311 |
|
Review Stop |
SIGNATURE |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2020-10-13 16:48:25 | ALL OF THE DOCUMENTS FROM THE ENGINEER ARE NOT | | DIGITALLY SIGNED. THE THREE SECTION DRAWINGS ARE NOT | | DIGITALLY SIGNED BY THE ENGINEER. THE STUCCO REPAIR | | DOCUMENT IS NOT DIGITALLY SIGNED BY THE ENGINEER. | | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | 61G15 | | |
|