2020-11-04 07:25:22 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE WIND SPEED FOR THIS PROJECT IS SPECIFIED AS 175 | | MPH ON THE DRAWINGS AND CALCULATIONS. THE ACTUAL WIND | | SPEED IS 170 MPH VULT. USING THIS LOWER WIND SPEED | | SHOULD LOWER THE REQUIRED OPENING PRESSURES. FBC1609 | | | | 2) THE DESIGN PRESSURE CALCULATIONS USED ASCE 7-16. | | THIS EDITION OF ASCE IS NOT REFERENCED IN THE CURRENT | | CODE (2017 FBC). PLEASE USE ASCE 7-10 TO DETERMINE THE | | OPENING PRESSURES. FBC CHAPTER 35 | | | | 3) IN THE SCHEDULE ON SHEET A-1, THE COLUMN WITH THE | | PRESSURES REQUIRED FOR THE SPECIFIC OPENINGS DO NOT | | MATCH THE PRESSURES THAT ARE IN THE CLOUDED AREAS ON | | THE DETAILED ELEVATIONS. PLEASE COORDINATE. FBC 107.2 | | | | 4) THE POSITIVE PRESSURE IN THE CLOUDED AREA ON THE | | DETAILED ELEVATION FOR OPENING #7 IS +102.3 PSF AND THE | | PRESSURE IN THE SCHEDULE FROM THE PRODUCT APPROVAL IS | | +80 PSF. THIS DOES NOT MEET THE REQUIRED OPENING | | PRESSURE. PLEASE CORRECT. FBC 107.2 & 1609 |
|