Plan Review Notes For Permit 20090071 |
Permit Number |
20090071 |
|
Review Stop |
FIRE |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2020-09-08 11:00:56 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | INSPECTION. | | | | | | 1) THE FOLLOWING CODE REFERENCE ON SHEET 1 OF 3 DOES | | NOT APPLY: 25.2.1.6 MODIFICATIONS THAT CANNOT BE | | ISOLATED, SUCH AS RELOCATED DROPS, SHALL NOT REQUIRE | | TESTING IN EXCESS OF SYSTEM WORKING PRESSURE. | | | | PER NFPA 13 | | | | 25.2 ACCEPTANCE REQUIREMENTS. | | | | 25.2.1* HYDROSTATIC TESTS. | | | | 25.2.1.1 UNLESS PERMITTED BY 25.2.1.2 THROUGH 25.2.1.8, | | ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO | | SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED | | AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE | | WITHOUT LOSS FOR 2 HOURS. | | | | 25.2.1.5 WHERE ADDITION OR MODIFICATION IS MADE TO AN | | EXISTING SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE | | NEW PORTION SHALL BE ISOLATED AND TESTED AT NOT LESS | | THAN 200 PSI (13.8 BAR) FOR 2 HOURS. | | | | | | PLEASE ENSURE COMPLIANCE AND REQUIRED TESTING P.S.I. | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | | | |
|