2020-10-21 16:23:47 | THE PRE-FAB GENERATOR PAD ENGINEERING IS REQUIRED TO BE | | SIGNED AND SEALED. ELECTRONICALLY SUBMITTED DRAWINGS | | ARE REQUIRED TO HAVE THE ENGINEER'S DIGITAL SIGNATURE | | ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT THE SIGNED | | AND SEALED PAPER VERSION OF DRAWINGS. AFTER THE | | ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT THE | | CORRESPONDING PAPER DRAWINGS AT THE BUILDING DEPARTMENT | | TO BE VERIFIED. THE ENGINEER'S ORIGINAL HANDWRITTEN | | SIGNATURE AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. | | NO PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | ACCEPTABLE. FS 471 & 61G15 |
|