Plan Review Notes
Plan Review Notes For Permit 20080765
Permit Number 20080765
Review Stop P
Sequence Number 1
Notes
Date Text
2020-08-26 11:03:0708/26/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
  
 1. ON SHEET A-6 PLEASE PROVIDE A SOURCE AND LOCATION OF
 HOT WATER PER THE 2017 RES R 2722.2 HOT WATER.
  
 2. ON SHEET A-6 PLUMBING ISOMETRIC BETWEEN THE SHOWER
 AND TOILET NEED TO HAVE VENT AND YOU MAY USE THE LAV
 PER THE 2017 FBC SEC. REC R 3101.2.
  
 3. ON SHEET A-6 THERE IS AN ARROW FOR DIRECTION OF
 FLOW, AND IT IS SHOWING A 2" LINE BETWEEN TWO 3"
 CONNECTIONS, PLEASE SHOW THE FLOW TO CITY LATERAL AND
 SHOW CLEAN OUT OUTSIDE BUILDING ALONG WITH DESTINATION
 OF PIPE FORM OR TO SEWER. IF YOU HAVE THE MAIN HOUSE IN
 FRONT, PLEASE LABEL ACCORDINGLY PER THE WPB AMENDMENTS
 TO THE FBC SEC. 107.2.1.4 QUALITY OF BUILDING PLANS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved