2020-08-26 11:22:21 | 08/26/20 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. ON SHEET A-6; |
| A. IT SHOWS A GRILL, IS THIS GRILL CONNECTED TO A CITY |
| GAS SOURCE OR IS IT A PROPANE TANK TYPE, PLEASE |
| CLARIFY. |
| |
| B. SUBMIT MANUFACTURER'S SPECIFICATION |
| SHEETS/INSTALLATION MANUAL FOR GAS GRILL EQUIPMENT TO |
| VERIFY COMPLIANCE WITH 2017 FBC RES. SEC. G2408.1. |
| |
| C. THE GAS GRILL SEEMS TO BE IN A COVERED PATIO, IF SO, |
| PLEASE PROVIDE MANUFACTURES RECOMMENDATION FOR A |
| VENTILATION OF A HOOD PER THE 2017 FBC RES. SEC. |
| G2408.1. |
| |
| D. THIS GRILL MAY REQUIRE VENT TO THE BASE CABINET SO |
| PLEASE PROVIDE MANUFACTURES SPECIFICATION TO VERIFY |
| WHERE AND HOW MANY MAY BE NEEDED PER THE WPB AMENDMENTS |
| TO THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION |
| DOCUMENTS. |
| |
| 2. A SUB GAS PERMIT MAY BE REQUIRED BY A LICENSED |
| CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| TO THE FBC SEC. 105.1 WPB AMENDMENTS TO THE FBC |
| SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| 3. GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT THIS TIME. |
| A SEPARATE GAS PERMIT AND PLANS MAY BE SUBMITTED. |
| PROVIDE COMPLETE PLANS AND GAS RISER THAT REFLECTS THE |
| ENTIRE SCOPE OF GAS WORK TO BE DONE PER THE WPB |
| AMENDMENTS TO FBC SEC. 107.2.1. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |