Date |
Text |
2020-09-24 11:23:56 | 09/24/20 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. A SUB GAS PERMIT IS REQUIRED BY A LICENSED |
| CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| TO THE FBC SEC. 105.1. |
| |
| 2. PLEASE PROVIDE MANUFACTURES SPECIFICATION FOR |
| TANK-LESS TO VERIFY BTU AND COMPLIANCE, IF ITS HAS |
| CONDENSATE IT WILL NEED TO DRAIN 1' AWAY FROM THE |
| STRUCTURE PER THE 2017 FBC SEC. R318.5. |
| |
| 3. THE CITY RECORD HAS A DIFFERENT BTU LOAD FOR THE |
| EXISTING GENERATOR AS IT NEEDS TO BE CALCULATED ON THE |
| NEW SYSTEM BEFORE AN EVALUATION. PLEASE SUBMIT THE |
| MANUFACTURE'S SPECIFICATION OR VERIFY WITH WHAT IS |
| INSTALLED PER THE 2017 FBC RES. SEC. G2413. |
| |
| 4. SUBMIT CALCULATIONS FOR COMBUSTION AIR (CLOTHES |
| DRYERS) PER THE 2017 FBC RES. SEC. G2407.1 AND G2439.4. |
| |
| 5. SUBMIT MANUFACTURER?S SPECIFICATION |
| SHEETS/INSTALLATION MANUAL FOR ALL NEW GAS EQUIPMENT TO |
| VERIFY COMPLIANCE WITH 2017 FBC RES. SEC. G2408.1. |
| |
| 6. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT |
| SHALL BE ONSITE AT THE TIME OF INSPECTION PER THE 2017 |
| FBC RES. SEC. G2413.2 AND G2404.3. |
| |
| 7. THE SIZING TABLE USED IN THE DESIGN FOR THE GAS |
| SYSTEM IS NOT CLEAR FOR THE CORRECT TABLE NUMBER IN THE |
| DESIGN OF THIS SYSTEM PER THE WPB AMENDMENTS TO FBC |
| SEC.107.2.1. |
| |
| 8. THE PLANS INDICATE AN EXISTING GAS METER. THE BTU |
| LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE |
| TOTAL BTU LOAD ON THE SYSTEM ON THE ISOMETRIC AND |
| LEGEND TO ENSURE THE EXISTING SYSTEM IS PROPERLY SIZED. |
| IF UNDERSIZED, THE EXISTING SYSTEM MUST BE REDONE TO |
| ENSURE A SAFE OPERATING SYSTEM. 2017 FBC RES. SECS. |
| G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. NOTE THE |
| ASSUMED LOAD IS INCORRECT. |
| |
| 9. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE |
| PRESSURE REGULATORS PER THE 2017 FBC RES. SEC. G2421.1. |
| |
| 10. PLEASE SHOW AND LABEL ALL UNIONS IN FRONT OF |
| REGULATOR 1? OF EITHER SIDE PER THE 2017 FBC RES. SEC |
| G2421.2. |
| |
| 11. PLEASE SHOW AND OR LABEL THE SHUTOFF VALVE, |
| REGULATOR, AND DRIP LEG ON GAS ISOMERIC PER THE 2017 |
| FBC RES. SEC. G2401.1.3. |
| |
| 12. PLEASE SHOW THE LOCATION AND DISTANCE OF ANY |
| OPERABLE DOORS OR WINDOWS IN RELATION TO THE WATER |
| HEATER. THE LOCATION OF THE WATER HEATER SHALL COMPLY |
| WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS PER |
| THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION |
| ON CONSTRUCTION DOCUMENTS. |
| |
| HTTPS://CODES.ICCSAFE.ORG/CATEGORY/FLORIDA?YEAR%5B%5D=C |
| URRENT+ADOPTION&PAGE=1 |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |