2020-08-12 17:08:33 | 08/12/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. PLEASE SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR |
| THE MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP |
| FROM ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN |
| DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER |
| ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. IT |
| REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE DOES NOT |
| EXCEED THE LISTED MAXIMUM FLOW RATE OF THE SUCTION |
| OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH |
| CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS |
| INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, |
| HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS |
| EXCEPT THE PUMP. |
| |
| 2. SUBMIT LEGIBLE COPIES OF THE POOL PUMP CURVE. |
| INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC |
| TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS |
| NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH |
| CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS. |
| 4.4.9, 4.4.9.1. |
| |
| 3. SUBMIT SPECIFICATIONS FOR THE PUMP AND CARTRIDGE |
| FILTER PER THE WPB AMEND. TO FBC SEC. 107.2.1. |
| |
| 4. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED |
| CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| TO THE FBC SEC. 105.1. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING PLAN EXAMINER / INSPECTOR |
| EMAIL: [email protected] OFFICE: 561 805-6720 |
| |
| |