2020-09-09 13:38:03 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE MULLION THAT WAS SELECTED ON SHEET 3 OF 18 ON | | NOA NO. 19-0131.11 DOES NOT MEET THE REQUIRED NEGATIVE | | PRESSURE FOR THE OPENING. THE REQUIRED PRESSURES FOR | | THE OPENING ARE +65.9 , -120.8 PSF. THE 2 X 4 STD. | | MULLION IS RATED FOR + OR - 106.2 WHICH IS MEETS THE | | POSITIVE PRESSURE BUT NOT THE NEGATIVE. THE 2 X 4 | | CUSTOM MULLION HAS A + OR - 130 PSF WHICH WILL WORK. | | SELECT A MULLION THAT HAS A DESIGN PRESSURE OF MORE | | THAN 120.8 PSF. |
|