Plan Review Notes
Plan Review Notes For Permit 20070654
Permit Number 20070654
Review Stop G
Sequence Number 1
Notes
Date Text
2020-08-12 12:12:241.) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, ( MP
 REGULATOR ) TO THE GENERATOR.PER THE 2017 FBC-FUEL GAS
 SEC.402.4.1, 402.4.2, OR 2017 FBC-RES. SEC. G 2413.4.1,
 G2413.4.2.
 2) THE PLANS INDICATE AN EXISTING GAS METER. THE BTU
 LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED INTO THE
 TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE EXISTING
 SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE EXISTING
 SYSTEM MUST BE REDONE TO ENSURE A SAFE OPERATING
 SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM THAT SHOWS
 THE TYPE OF EXISTING APPLIANCE, THE BTU LOAD OF EACH
 APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE TO EACH
 APPLIANCE, AND THE DISTANCE OF THE LONGEST LENGTH OF
 PIPING FROM THE POINT OF DELIVERY TO THE MOST REMOTE
 OUTLET AND THE LOAD OF THE SECTION. FGC SECS. 401.4,
 401.8, 402.1, 402.2, 402.3 OR FBCR SECS.G2412.4,
 G2412.8, G2413.1, G2413.2, G2413.3.
 3) INDICATE ON THE GAS DRAWING HOW THE EXISTING SYSTEM
 WILL BE RETROFITTED TO HANDLE THE 2 PSI SYSTEM.
 4) SUBMIT MANUFACTURER?S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. 2014 FGC
 SEC.410.1, 2017 FBC-RES. SEC. G2421.1.
 5) THE GALVANIZED PIPING SHALL BE LOCATE A MINIMUM OF 3
 1/2/ INCHES ABOVE GRADE. FBC-FUEL GAS SEC. 404.9.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  