Plan Review Notes
Plan Review Notes For Permit 20070291
Permit Number 20070291
Review Stop P
Sequence Number 1
Notes
Date Text
2020-07-23 13:28:531) SHEET AE-310 DEATIL #1 - THERE IS A NOTE THAT REFERS
 TO SHT. AE-330, DETAIL #9 FOR A ROOF DRAIN DETAIL.
 THERE IS NO SHEET AE- 330 IN THESE PLANS. CLARIFY.
 2) SHT.AE- 323 - SUBMIT A SECTION DETAIL OF THE
 EXFILTRATION TRENCH SHOWN AT THE BASE OF THE FOOTERS.
 WPB AMEND. TO FBC SEC. 107.2.1.
 3) SHT. P-11 - THE SANITARY DRAIN LINE FROM THE BAR
 AREA SHALL DISCHARGE TO THE GREASE INTERCEPTOR
 FBC-PLUMBING SEC.1003.3.1.
 4) SHT. M-8 - WORK NOTE #3 REFERS TO THE CONDENSATE
 DRAIN ROUTED TO NEAREST PLUMBING BOX. CONDENSATE IS NOT
 PERMITTED TO DISCHARGE INTO THE CITY'S SANITARY SYSTEM
 PER CITY ORDINANCE CHAPTER 90, ARTICLE III, SEC.90-126
 (B)(5).
 5) A BACKFLOW PREVENTION DEVICE IS REQUIRED ON THE
 FOLLOWING ITEMS: HOT FOOD WELL, STEAMER, FOOD DIGESTER,
 SODA AND WATER DISPENSER,COFFEE BREWER, ICED TEA
 BREWER, ICED TEA BREWER, COFFEE MAKER, & WATER FILTER.
 THE TYPE OF BACKFLOW DEVICE SHALL COMPLY WITH
 FBC-PLUMBING TABLE 608.1 FOR THE SPECIFIC APPLICATION.
 6) SUBMIT SPECIFICATIONS/DETAILS ON THE TYPE OF GREASE
 INTERCEPTOR TO BE INSTALLED. IF AN EXISTING INTERCEPTOR
 IS BEING USED, SUBMIT VERIFICATION THAT THE EXISTING
 UNIT HAS THE CAPACITY FOR THE ADDITIONAL LOAD.
 7) SHT. P-9 - GREASE INTERCEPTOR SIZING TABLE - IN THE
 ROW FOR 4 INCH PIPE, WHERE DID THE 150 GPM COME FROM?
 ALSO, WHERE DID THE COEFFICIENT OF 0.0455 COME FROM? I
 COULD NOT FIND EITHER OF THOSE ITEMS IN THE SIZING
 STANDARD PDI- G101.
 8) SHT. P-10 - WORK NOTE #1 REFERS TO SHT. P-7. THE IS
 NO SUCH SHEET IN THIS SUBMITTAL. CLARIFY.
 9) SHT. P-10 - SIZE THE MAIN BRANCH LINES ON THE WATER
 RISER. WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 10) HOSE BIBBS SHALL BE EQUIPPED WITH SEPARATE SHUTOFF
 VALVES. FBC-PLUMBING SEC.606.2 (2).
 11) SHT. P-10 - SHOW THE SIZE OF EACH WATER LINE AT THE
 MANIFOLD. WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 12) SHOW THE TANKLESS WATER HEATER ON THE WATER RISER
 AND ALSO ON THE PLAN VIEW.
 13) SUBMIT WATER AND SANITARY RISERS FOR THE NEW TOILET
 ROOMS AND OTHER PLUMBING ON THE LOWER AND UPPER LEVELS.
 WPB AMEND. TO FBC SEC. 107.2.1.
 14) IS THERE A SUMP PUMP BEING INSTALLED IN THE
 ELEVATOR PIT? IF SO, SUBMIT PIPING ISOMETRIC. SHOW
 COMPLIANCE WITH FBC-PLUMBING SECS.301.6, 1003.4.
 15) SHT.P-9 - THE VENTED CLEANOUT ADJACENT TO FIXTURE
 PK 6 DOES NOT COMPLY WITH THE PLUMBING CODE AND CREATES
 A FLAT, DRY VENT. EVERY DRY VENT CONNECTING TO A
 HORIZONTAL DRAIN SHALL CONNECT ABOVE THE CENTERLINE OF
 THE HORIZONTAL DRAIN PIPE. FBC-PLUMBIBNG SEC.905.3.
 16) SHT. P-9 - THE VENTED CLEANOUT FOR THE FLOOR SINKS
 FOR FIXTURES PK 42 & PK44 DOES NOT COMPLY WITH THE
 PLUMBING CODE AND CREATES A FLAT, DRY VENT. EVERY DRY
 VENT CONNECTING TO A HORIZONTAL DRAIN SHALL CONNECT
 ABOVE THE CENTERLINE OF THE HORIZONTAL DRAIN PIPE.
 FBC-PLUMBIBNG SEC.905.3. THIS ALSO OCCURS AT THE VENTED
 WALL CLEANOUT BY FIXTURE PK1.
 17) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 FOLLOWING EQUIPMENT: STEAMER, FOOD DIGESTOR, AND
 DISHMACHINE. WPB AMEND. TO FBC SEC. 107.2.1.
 18) THE SINK IN COPY ROOM E129 MAY BE REQUIRED TO
 COMPLY WITH THE FBC-ACCESSIBIRITY SECS.212.3, 606.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved