2020-08-26 12:32:3208/26/20 1ST GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. ON THE BTU'S FOR THE GENERATOR YOU HAVE 308 AND ON
 THE 2020 UPDATED VERSION IT CALLS OUT A LP FULL LOAD AT
 136 BTU'S, PLEASE CHANGE AND SUBMIT THE LATEST VERSION
 FOR YOUR GENERATOR SPEC FOR 2020 VERSION PER THE WPB
 AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 2. CLEARLY SHOW THE LOCATION OF LP TANK(S), TYPE OF
 TANK (DOT OR ASME), THE DISTANCE OF THE TANK FROM THE
 EXTERIOR BUILDING WALL AND ADJACENT PROPERTY LINES, THE
 DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION,
 OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY
 BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK
 PER THE NFPA 58, TABLE 3-2.2.2.
  
 3. PROVIDE THE UG TANK CLEARANCE DISTANCES MEASUREMENTS
 TO THE HOUSE, DRIVEWAY, AND PROPERTY LINE- SEE TABLE
 6.4.1.1 AND SECTION 6.8.6.1 NFPA 58. PLEASE NOTE THAT
 IF THE TANK IS LESS TANK 10 FT. FROM THE DRIVEWAY, THE
 SHELL FOR THE TANK SHALL BE 18 IN. ABOVE GRADE, AND
 VEHICULAR BARRIER PROTECTION WILL BE REQUIRED.
  
 4. CLEARLY SHOW THE METHOD OF TIE DOWN FOR THE LP TANK
 BELOW GROUND, IT SHALL BE ANCHORED PER NFPA 58
 SEC.3-2.2.7 (H). PLEASE PROVIDE A TIE DOWN FOR THE TANK
 IF AN ENGINEERED ONE IS PROVIDED PLEASE PROVIDE WHO
 PREPARED THE TANK TIE-DOWN DETAILS AND SHALL PROVIDE AN
 ELECTRONIC SIGNATURE AND SEAL ON THE DOCUMENT- FL.
 STATUTE 471.025 & FLORIDA ADMINISTRATIVE CODE SEC.
 61G15-23.005. PROVIDE THE SIZE OF THE HOLD-DOWN
 CABLES/STRAPS FOR THE TANK AND THE TYPE AND LENGTH OF
 GROUND ANCHORS TO BE INSTALLED TO PREVENT FLOTATION PER
 THE NFPA 58 SEC. 6.6.1.6.
  
 5. IF YOU ARE USING STRAPS OR CABLE, IF CABLE, HOW IS
 IT PROTECTED FOR THE LP TANK AND APPURTENANCES PER NFPA
 58 AND WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 6. A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER
 NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE
 MONITORED PER THE NFPA 58 SEC.6.6.6.1 (J). SUBMIT
 DETAILS ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS.)
 & A NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE
 CABLE AMOUNT OF WATER TO ACTIVATE IT.
  
 7. SHOW THE DEPTH OF THE LP GAS CONTAINER BELOW GRADE
 TO COMPLY WITH NFPA 58 SEC. 6.6.6.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  