2020-07-10 12:42:28 | SHUTTER |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) PLEASE SHOW THE BUILDING EGRESS - WHEN SHUTTERS ARE |
| INSTALLED --- FBC R310.4 WHILE SUCH PROTECTION IS |
| PROVIDED, AT LEAST ONE MEANS OF ESCAPE FROM THE |
| DWELLING OR DWELLING UNIT SHALL BE PROVIDED. THE MEANS |
| OF ESCAPE SHALL BE WITHIN THE FIRST FLOOR OF THE |
| DWELLING OR DWELLING UNIT AND SHALL NOT BE LOCATED |
| WITHIN A GARAGE WITHOUT A SIDE-HINGED DOOR LEADING |
| DIRECTLY TO THE EXTERIOR. OCCUPANTS IN ANY PART OF THE |
| DWELLING OR DWELLING UNIT SHALL BE ABLE TO ACCESS THE |
| MEANS OF ESCAPE WITHOUT PASSING THROUGH A LOCKABLE DOOR |
| NOT UNDER THEIR CONTROL. |
| 2) COMPLETE THE FORM TITLED "SCHEDULE FOR INSTALLATION |
| OF OPENING PROTECTIVE DEVICES OR ASSEMBLIES" OR PROVIDE |
| ALL INFORMATION REQUIRED IN ANOTHER FORMAT (SUCH AS |
| EXCEL SPREADSHEET). WHEN COMPLETING THE INSTALLATION |
| SCHEDULE, PLEASE NOTE FACTORS APPLY DEPENDING ON |
| SUBSTRATE, EDGE DISTANCE AND FASTENER. FOR FASTENER, IF |
| USING TAPCON, BE SPECIFIC AS TO WHICH TAPCON (TAPCON |
| W/ADVANCED THREADFORM TECHNOLOGY MAY REQUIRE A .9 |
| FACTOR). |
| |
| FORMS CAN BE PROVIDED BY EMAILING [email protected] AND ASKING |
| FOR "SCHEDULE FOR INSTALLATION OF OPENING PROTECTIVE |
| DEVICES OR ASSEMBLIES? FORM. |
| |
| |