Date |
Text |
2020-10-02 14:22:45 | SIGNATURE REVIEW COMMENTS: |
| 1- STRUCTURAL DRAWINGS: |
| A)THE STRUCTURAL DRAWINGS THAT WERE DROPPED OFF IN CITY |
| HALL DON'T HAVE THE SIGNATURE OF THE ENGINEER OF |
| RECORD. (NOTE: DRAWINGS UPLOADED TO PROJECTOX WERE NOT |
| SIGNED/SEALED BY THE ENGINEER OF RECORD EITHER). |
| DRAWINGS NEED TO HAVE THE ORIGINAL SIGNATURE AND DATE |
| OF THE ENGINEER WHO SIGNED THE PLANS AS REQUIRED BY |
| SEC. 61G15-23.001 FAC AND CHAPTER 471 F.S. WHEN |
| SUBMITTING PLANS/DOCUMENTS FOR PUBLIC RECORDS. |
| PLANS NEED TO BE RE-UPLOADED TO PROJECTDOX WITH THE |
| ENGINEER'S SEAL/SIGNATURE. |
| |
| NOTE: IN ORDER TO EXPEDITE THE REVIEW PROCESS, IT IS |
| PREFERABLE TO DOWNLOAD THE STRUCTURAL DRAWINGS TO |
| PROJECTDOX WITH THE ENGINEER'S DIGITAL SIGNATURE. |
| OTHERWISE, HARD COPY PLANS WITH ENGINEER'S ORIGINAL |
| SEAL/SIGNATURE THAT MATCH PLANS UPLOADED TO PROJECTDOX |
| ARE REQUIRED TO BE DROPPED OFF IN CITY HALL. |
| |
| |
| B)THE STRUCTURAL DRAWINGS THAT WERE DROPPED OFF IN CITY |
| HALL DON'T MATCH ONES UPLOADED TO PROJECTDOX. PLANS |
| UPLOADED TO PROJECTDOX WERE REVISED 2 OR 3 TIMES |
| ALREADY. NOTE: COORDINATE WITH ITEM 1A ABOVE. SEC. |
| 107.2.1 CITY AMENDMENTS. |
| |
| 2- ARCHITECTURAL PLANS THAT WERE DROPPED OFF IN CITY |
| HALL DON'T MATCH ARCHITECTURAL PLANS UPLOADED TO |
| PROJECTDOX. DRAWINGS IN PROJECTDOX DON'T HAVE DRAWING |
| A101, A501. ALSO, DRAWINGS DROPPED IN CITY HALL ARE |
| MISSING DRAWING A105. |
| PLEASE COORDINATE HARDCOPY PLANS WITH PLANS UPLOADED TO |
| PROJECTDOX TO AVOID CONFLICTS/DELAYS. |
| SEC. 107.2.1 CITY AMENDMENTS. |
| |
| |
| PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| QUESTIONS REGARDING THESE COMMENTS, |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| (561)805-6712 |
| [email protected] |
| |