Date |
Text |
2020-08-17 15:32:47 | NEW SFR |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected]. |
| CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| AMENDMENTS |
| |
| CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| 1) PLEASE SHOW ONE BATHROOM/TOILET ROOM DOOR ON THE |
| FIRST FLOOR TO HAVE A 29-INCH CLEAR OPENING FBC |
| R320.1.1 (A 2' 6" DOOR DOES NOT PROVIDE A 29" CLEAR |
| OPENING FROM THE EDGE OF DOOR TO THE DOOR STOP WHEN |
| OPEN AT 90 DEGREE). |
| 2) PLEASE SHOW THE WINDOWSILL HEIGHT FOR THE SLEEPING |
| ROOM EMERGENCY EGRESS WINDOWS TO COMPLY WITH FBC |
| R310.2.2 |
| 3) PLEASE SHOW THE LOCATION AND SIZE OF THE REQUIRED |
| ATTIC ACCESS TO ALL ROOF AREAS FBC R807.1 |
| 4) PLEASE SHOW THE FLOOR / CEILING ASSEMBLY REQUIRED |
| DRAFT STOPPING DETAILS AND LOCATIONS FBC R302.12 |
| 5) PLEASE SHOW THE GUARD RAIL DETAILS TO COMPLY WITH |
| FBC R312 |
| 6) PLEASE SHOW THE GUARD RAIL ATTACHMENTS TO COMPLY |
| WITH THE REQUIRED LIVE LOADS FBC R301.5 |
| 7) PLEASE SHOW THE BLDG. SQUARE FOOTAGE - LIVING SPACE, |
| ROOFED PATIO AND GARAGE. |
| 8) PRODUCT APPROVALS (17-0504.01) AND (18-0430.06) ARE |
| NOT SHOWING UP PROPERLY IN PROJECTDOX - PLEASE UPLOAD |
| THEM TO PROJECTDOX AGAIN. |
| 9) SIGNED AND SEALED DRAWINGS AND DOCUMENTS IN |
| PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED |
| BY THE ENGINEER OR ARCHITECT TO BE USED IN ELECTRONIC |
| PLAN REVIEW. - OR - IF YOUR ENGINEER OR ARCHITECT DOES |
| NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - PLEASE |
| DROP OFF (CITY HALL DROP BOX) THE ORIGINAL SIGNED AND |
| SEALED DRAWINGS/DOCUMENTS ALONG WITH A "PLAN REVIEW |
| REQUEST FORM" EXPLAINING THE REASON FOR SUBMITTING THE |
| DOCUMENT OR DRAWINGS. PLAN REVIEW REQUEST FORM CAN BE |
| OBTAINED BY E MAILING [email protected] AND ASKING FOR THE |
| FORM. |
| |