Plan Review Notes For Permit 20061332 |
Permit Number |
20061332 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2020-07-01 14:58:08 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE PRECAST PARKING GARAGE ERECTION DRAWINGS ARE | | REQUIRED TO BE REVIEWED AND APPROVED BY THE STRUCTURAL | | ENGINEER OF RECORD FOR GENERAL CONFORMANCE WITH THE | | DESIGN OF THE PROJECT. THE DESIGNER OF RECORD IS | | REQUIRED TO IMPRINT THE DRAWINGS WITH THEIR SHOP | | DRAWING REVIEW STAMP AND NOTE AS APPROVED OR APPROVED | | WITH EXCEPTIONS BEFORE SUBMITTING THE DRAWINGS TO THE | | BUILDING DEPARTMENT. FAC 61G15-30.006 & CITY AMENDMENTS | | FBC 107.3.4 THE REGISTERED DESIGN PROFESSIONAL IN | | RESPONSIBLE CHARGE SHALL BE RESPONSIBLE FOR REVIEWING | | AND COORDINATING SUBMITTAL DOCUMENTS PREPARED BY | | OTHERS, INCLUDING PHASED AND DEFERRED SUBMITTAL ITEMS, | | FOR COMPATIBILITY WITH THE DESIGN OF THE BUILDING. |
|