Plan Review Notes
Plan Review Notes For Permit 20061050
Permit Number 20061050
Review Stop P
Sequence Number 1
Notes
Date Text
2020-07-30 13:51:3907/30/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS
 SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS
 IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE
 TDH CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS.
 4.4.9, 4.4.9.1.
  
 2. INDICATE ON THE PUMP CURVE WHICH CURVE KEY IS FOR
 THE PUMP BEING INSTALLED ON THIS SYSTEM PER THE WPB
 AMEND. TO FBC SEC. 107.2.1.
  
 3. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 CARTRIDGE FILTER AND THE PUMP PER THE WPB AMENDMENTS TO
 FBC SEC. 107.2.1.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved