Plan Review Notes
Plan Review Notes For Permit 20060761
Permit Number 20060761
Review Stop P
Sequence Number 2
Notes
Date Text
2021-08-06 15:55:442ND REVIEW FBC-2017 PLUMBING
 PERMIT- 20060761
 8/6/2021
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017
 FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED. A NARRATIVE RESPONSE HAS
 BEEN PROVIDED TO THE IST REVIEW PLUMBING COMMENTS,
 HOWEVER THE DOCUMENT WAS NOT SIGNED AND HAD NO REPLY
 INFORMATION PROVIDED. THE NARRATIVE STATES THAT
 PLUMBING PLANS WILL BE UPLOADED SEPARATELY. AS I COULD
 NOT LOCATE THE (P) PLUMBING PLANS, PLEASE CLARIFY IF
 THE PLANS ARE TO BE UPLOADED "SEPARATELY" UNDER A
 SEPARATE PERMIT OR UNDER THIS PERMIT. SHEET A100
 INDICATES BATH AND BAR FIXTURES AND UNDERSLAB DRAIN
 PIPING AS EXISTING. PLEASE NOTE I HAVE RESEARCHED
 BUILDING DEPARTMENT RECORDS AND WAS UNABLE TO LOCATE A
 PERMIT FOR THE SECOND BATHROOM AND BAR IN THE SPACE. IT
 APPEARS THAT ONE BATHROOM WAS CONSTRUCTED UNDER THE
 MAIN BUILDING PERMIT FOR BUILDING-4 BUT THE RECORD
 PLANS THAT WERE UPLOADED SHOW A SINGLE BATHROOM AND THE
 MAIN DRAIN TO THE NORTH OF THE BATHROOM. SHEET A100
 SHOWS A SECOND BATHROOM AND THE DRAIN RUNNING SW OF THE
 BATHROOMS. FAILED COMMENTS FROM THE 1ST REVIEW ARE
 LISTED BELOW WITH ADDITONAL NOTES FOR FURTHER
 CLARIFICATION.
  
 1) FAILED. PROVIDE PLUMBING FIXTURE CALCULATIONS.
 PROVIDE A SCHEDULE ON THE PLAN SHOWING THE REQUIRED AND
 PROVIDED NUMBER OF FIXTURES PER TABLE 403.3 FBC P.
 PLEASE NOTE THAT DRINKING FOUNTAINS AND SERVICE SINKS
 ARE REQUIRED FOR F AND A OCCUPANCIES. AN EMERGENCY
 SHOWER AND EYE WASH STATION MAY BE REQUIRED FOR THE F
 OCCUPANCY DEPENDING UPON DEPARTMENT OF HEALTH,
 DEPARTMENT OF AGRICULTURE, OSHA, OR OTHER GOVERNING
 AGENCY REQUIREMENTS. PLEASE CONTACT THOSE AGENCIES FOR
 FURTHER INFORMATION. NOT PROVIDED. PLEASE NOTE THAT THE
 BUILDING PLANS EXAMINER HAS DETERMINED THE BREWERY IS A
 MIXED OCCUPANCY. REFER TO SECTION 403.1.1 FBC P-
 FRACTIONAL NUMBERS RESULTING FROM APPLYING THE FIXTURE
 RATIOS OF TABLE 403.1 SHALL BE ROUNDED UP TO THE NEXT
 WHOLE NUMBER. FOR CALCULATIONS INVOLVING MULTIPLE
 OCCUPANCIES, SUCH FRACTIONAL NUMBERS FOR EACH OCCUPANCY
 SHALL FIRST BE SUMMED AND THEN ROUNDED UP TO THE NEXT
 WHOLE NUMBER.
  
 3) FAILED. A.100: THE PLAN INDICATES ACCESS TO ONE OF
 THE TWO TOILET ROOMS IS THROUGH A STORAGE AND BREWERY
 AREA WHICH IS NOT ALLOWED PER SECTION 403.3.1 FBC P. NO
 CHANGES MADE TO THE PLAN.
  
 4) FAILED. A.100: THE PLAN SHOWS NEW SINKS IN WHAT
 APPEARS TO BE A BAR AREA, HOWEVER PLUMBING PLANS WERE
 NOT PROVIDED FOR THE PROPOSED PROJECT. PLEASE SUBMIT
 PLUMBING PLANS SHOWING THE LOCATIONS OF ALL NEW OR
 RELOCATED FIXTURES, FLOOR DRAINS, TRENCH DRAINS,
 INDIRECT WASTE RECEPTORS, ETC. PROVIDE SANITARY AND
 WATER RISER ISOMETRIC DRAWINGS, AND FLAT LINE PIPING
 PLANS SHOWING THE POINTS OF CONNECTIONS TO THE EXISTING
 DWV AND WATER DISTRIBUTION SYSTEMS- SECTIONS 107.2.1
 AND 107.3.5.1.1 WPB. THE WATER RISER SHALL PROVIDE
 SYMBOLS TO INDICATE THE LOCATIONS OF REQUIRED BACKFLOW
 PREVENTERS, WATER HAMMER ARRESTORS, TRAP PRIMERS, SHUT
 OFF VALVES, AND ALL PIPING CONNECTIONS TO PROCESS OR
 BREWERY EQUIPMENT AND TANKS (IF APPLICABLE). NOT
 PROVIDED. IN ACCORDANCE WITH SECTION 107.3.5.1.3 WPB
 PLEASE PROVIDE PLUMBING PLANS INCLUDING ITEMS LISTED
 ABOVE AND:
 A) SANITARY DRAINAGE AND WATER PIPING LAYOUT PLANS AND
 ISOMETRIC DRAWINGS.
 B) A HOT WATER PLAN- LOCATIONS AND EQUIPMENT SCHEDULES
 FOR NEW WATER HEATERS- SECTION 502.1 FBC P & TABLE
 C404.1 FBC EC; THE MEANS OF PROVIDING TEMPERED WATER TO
 THE PUBLIC LAVATORES- SECTIONS 416.5 & 607.1.2 FBC P;
 HOT WATER PIPE INSULATION TABLE C403.2.10 FBC EC;
 LENGTH OF PIPING FROM THE HOT WATER SOURCE TO THE
 PUBLIC LAVATORIES- TABLE C404.5.1 FBC EC . PLEASE THE
 MAXIMUM DISTANCE IS 2 FT FOR ?-INCH PIPE.
  
 5) FAILED. PROVIDE PLUMBING FIXTURE AND DEVICE
 SCHEDULES INDICATING MAKES AND MODELS AND LISTING AND
 LABELING INFORMATION- SECTION 303 FBC P. A SCHEDULE HAS
 BEEN PROVIDED ON A SEPARATE DOCUMENT FROM THE PLANS,
 HOWEVER A CORRELATING PLUMBING LAYOUT PLAN (SEE COMMENT
 4) SHALL BE SUBMITTED IDENTIFYING THE LOCATIONS OF THE
 FIXTURES- SECTION 107.2.1 WPB.
  
 6) FAILED. REFER TO SECTION 1003.3.1 FBC P: A GREASE
 INTERCEPTOR WILL BE REQUIRED TO RECEIVE THE DRAINAGE
 FROM FIXTURES AND EQUIPMENT WITH GREASE-LADEN WASTE
 LOCATED IN THE BREWERY AND PROCESSING AREAS. SHOW ON
 THE PLANS THE DRAINAGE SYSTEM FOR THE TANKS AND KETTLES
 AND OTHER PROCESS EQUIPMENT. THE CITY OF WEST PALM
 BEACH HAS NOT REQUIRED GREASE INTERCEPTORS FOR
 BREWERIES UNLESS COOKING OPERATIONS ARE CONDUCTED AS
 PART OF THE BUSINESS. GREASE INTERECEPTORS ARE ALSO
 REQUIRED FOR OIL OR FAT LADEN DRAINAGE FROM FIXTURES.
 PLEASE SUBMIT A BREWERY MENU AS EVIDENCE TO VERIFY THE
 GREASE INBTERCEPTOR WILL NOT BE REQUIRED.
  
 7) FAILED. SHEET 8: REFER TO TABLE 608.1 AND SUBMIT
 SPECS FOR THE WATER SUPPLY HOSE BIB AND BACKFLOW
 PREVENTER, AND THE FDA HOSE AND CARBON FILTER- SECTION
 107.2.1 WPB. THE NARRATIVE STATES THE FILTER IS REMOVED
 HOWEVER IT IS STILL SHOWING ON SHEET A100.
  
 8) FAILED. SHEET 6: SHOW THE WATER FEED CONNECTION TO
 THE COLD WATER TANK. CLARIFY IF THE TANK WILL BE
 MANUALLY FILLED USING THE HOSE OR IF IT WILL BE
 HARD-PIPED- SEE SECTION 608.1 FBC P. A NEW FEED DIAGRAM
 HAS BEEN PROVIDED FOR THE TANKS BUT THE DIAGRAM DOES
 NOT SHOW THE LOCATION OF THE HOSE BIB AND POTABLE WATER
 SUPPLY LINE CONNECTION AS NO PLUMBING PLANS HAVE BEEN
 PROVIDED.
  
 9) FAILED. ACCESSIBILITY: PLEASE BE ADVISED THAT ALL
 NEW PLUMBING FIXTURES FOR PUBLIC USE SHALL BE
 ACCESSIBLE- SECTION 201.1 FBC ACC. THE SUBMITTED PLANS
 ARE NOT SHOWING ANY NEW PUBLIC USE FIXTURES, HOWEVER
 ALL REVISED PLANS INDICATING NEW FIXTURE INSTALLATIONS,
 INCLUDING THE REQUIRED DRINKING FOUNTAINS, SHALL
 INCLUDE INSTALLATION DRAWINGS AND DETAILS IN COMPLIANCE
 WITH SECTION 601.1 FBC ACC. THE LOCATION OF THE
 REQUIRED DRINKING FOUNTAINS IS NOT SHOWN AND THE
 REQUESTED ACCESSIBILITY COMPLAINCE DRAWINGS HAVE NOT
 BEEN PROVIDED. PLEASE REVIEW THE LIST OF COMPLIANCE
 BELOW PER THE FBC ACC:
 A) CLEAR FLOOR SPACE DIAGRAMS AND DIMENSIONS FOR THE
 WATER CLOSETS- SECTION 604.3.
 B) CLEAR FLOOR SPACE DIAGRAMS AND DIMENSIONS FOR THE
 LAVATORIES- SECTION 606.2.
 C) TURNING SPACE DIAMETERS- SECTION 304.3.
 D) CENTERLINES OF THE WATER CLOSETS FROM THE SIDE
 WALLS- SECTION 604.2.
 E) HEIGHTS OF THE WATER CLOSET SEATS FROM THE FINISHED
 FLOORS- SECTION 604.4.
 F) HEIGHTS OF THE LAVATORY SINK RIMS OR COUNTER
 SURFACES FROM THE FINISHED FLOOR- SECTION 606.3.
 G) HEIGHTS OF THE MIRRORS FROM THE FINISHED FLOORS TO
 THE REFLECTIVE SURFACES- SECTION 603.3
 H) LOCATIONS, LENGTHS, AND MOUNTING HEIGHTS OF GRAB
 BARS FOR THE WATER CLOSETS- SECTION 604.5 & 609.4,
 FIGURES 604.
 I) LOCATIONS OF THE WATER CLOSET FLUSH CONTROLS -
 SECTION 604.6.
 J) CENTERLINES OF THE TOILET PAPER DISPENSERS MEASURED
 FROM THE FRONTS OF THE WATER CLOSETS- SECTION AND
 FIGURE 604.7.
 K) KNEE AND TOE CLEARANCES FOR THE LAVATORIES- SECTION
 606.2
 L) REFER TO SECTIONS 306, 307, AND 602 FBC ACC AND
 PROVIDE DRINKING FOUNTAIN INSTALLATION DETAILS AND
 ELEVATION VIEWS SHOWING KNEE AND TOE CLEARANCES, SPOUT
 HEIGHTS, AND SPOUT LOCATIONS. SHOW THE REQUIRED 30 X 48
 IN. CLEAR FLOOR SPACE FOR A FORWARD WHEELCHAIR APPROACH
 TO THE FOUNTAIN- SECTION 602.2 FBC ACC, AND SHOW HOW
 THE LOCATIONS OF THE FOUNTAINS WILL BE IN COMPLIANCE
 WITH SECTION 307.2 PROTRUSION LIMITS.
  
 NEW COMMENT
 1) SHEETS 1, 2, 5, & 8 OF 8 SHEETS FROM INNOVATIVE
 ENGINEERING HAVE BEEN SUBMITTED., HOWEVER I DO NOT SEE
 THAT SHEETS 3, 4, 6, & 7 HAVE BEEN SUBMITTED. PLEASE
 PROVIDE THE SHEETS- SECTION 107.2.1 WPB. EQUIPMENT
 SPECS MISSING INCLUDE THE SPECS FOR THE BOIL KETTLE AND
 THE CHILLER- SECTION 107.2.1 WPB.
 2) IT APPEARS THAT ALL THE TANK SUBMITTALS DO NOT
 PROVIDE LISTING OR LABELING INFORMATION. HAVE THE TANKS
 BEEN TESTED IN ACCORDANCE WITH ANY ACCEPTED STANDARDS
 SUCH AS NSF OR IAMPO?- SECTION 102.4 AND 107.2.1 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved