Plan Review Notes
Plan Review Notes For Permit 20060478
Permit Number 20060478
Review Stop B
Sequence Number 1
Notes
Date Text
2020-07-01 10:23:46PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE PREFAB GENERATOR PAD DRAWING IS REQUIRED TO HAVE
 THE ENGINEER'S DIGITAL SIGNATURE. FS 71 AND FAC 61G15
  
 2) THE PREFAB GENERATOR PAD DRAWING SPECIFIES THE WIND
 LOAD PRESSURE CAPACITY OF A SPECIFIC GENERATOR AND THE
 PAD. THE REQUIRED WIND LOAD PRESSURES FOR THE LOCATION
 IS NOT PROVIDED. THE ENGINEERING THAT WAS SUBMITTED
 REQUIRES SITE SPECIFIC ENGINEERING TO DETERMINE THE
 WIND LOAD PRESSURES REQUIRED AT THE LOCATION OF THE
 PROJECT. FBC 107