Date |
Text |
2020-07-10 08:51:28 | 1) AS OF APRIL 16, 2015 THE MINIMUM ENERGY FACTOR OF |
| WATER HEATERS WITH A VOLUME AT OR BELOW 55 GALLONS SHAL |
| BE .95. THE ENERGY CALCULATIONS SHOW AN EFFICIENCY OF |
| .84. SUBMIT NEW ENERGY CALCULATIONS WITH THE REVISED |
| WATER HEATER EFFICIENCY. |
| 2) SHT.A10.1 - THE CALCULATIONS FOR THE ROOF DRAIN |
| LEADERS SHALL INCLUDE ONE-HALF THE AREA OF ANY VERTICAL |
| WALL PER 2017 FBC-PLUMBING SEC.1106.4. INCLUDE THESE |
| CALCULATIONS ON THE SHEET. |
| 3) THE RAIN LEADERS SHALL DISCHARGE A MINIMUM OF ONE |
| FOOT FROM THE EXTERIOR BUILDING WALL PER FBC-BUILDING |
| SEC.1503.7. |
| 4) SHT. A10.1 - THE PLANS NOTE THE OVERFLOW SCUPPERS |
| DIMENSIONS AS 3 X 5 INCHES. SCUPPERS SHALL HAVE AN |
| OPENING NOT LESS THAN 4 INCHES. PER FBC- PLUMBING SEC. |
| 1108.3. |
| 5) SHT. A10.4 - DETAIL "J" - SHOWS THE SCUPPER SIZE AS |
| 4 X 12 INCHES AND SHT. A10.1 SHOWS THE SIZE AS 4 X 9 |
| INCHES. CLARIFY. |
| 6) SHOW THE DIMENSIONS OF THE CLEAR FLOOR SPACES FOR |
| THE HANDICAP ACCESSIBLE FIXTURES ON SHT. A3.2. COMPLY |
| WITH FBC-ACCESSIBILITY SECS. 305.3, 604.3.1, 606.2. |
| 7) SHT. A3.5 - NOTE UNDER FIXTURE COUNT TABLE STATES |
| THAT A BEVERAGE FOUNTAIN WITH DRINKING WATER OFFERING |
| IS USED TO SATISFY THE DRINKING FOUNTAIN REQUIREMENT IS |
| UNACCEPTABLE. THE SAME NOTE APPEARS ON SHT.GC-0.0. |
| TABLE 403.1 OF THE FBC-PLUMBING REQUIRES A DRINKING |
| FOUNTAIN FOR THIS OCCUPANCY AND SEC. 410.3 OF THE |
| PLUMBING CODE AND SEC. 211.2 OF THE ACCESSIBILITY CODE |
| CLEARLY STATES THAT A MINIMUM OF TWO DRINKING FOUNTAINS |
| ARE REQUIRED. SHOW THE LOCATION OF THE DRINKING |
| FOUNTAINS ON THE PLANS AND THE REQUIRED CLEAR FLOOR |
| SPACE FOR THE FOUNTAINS. |
| 8) SHT. A3.5 - ADA COUNTER REACH RANGES SHALL COMPLY |
| WITH FBC-ACCESSIBILITY SECS.3308.2, 308.2.1, 308.2.2, |
| 308.3, 308.3.2. THE DETAIL ON THE PLAN DOES NOT COMPLY. |
| 9) SHT. A5.3 - THE HEIGHT OF THE GRAB BARS SHALL BE |
| MEASURED TO THE TOP OF THE GRIPPING SURFACE PER |
| FBC-ACCESSIBILITY SEC. 609.4. |
| 10) SUBMIT SIZING CALCULATIONS FOR THE GREASE |
| INTERCEPTOR. FBC-PLUMBING SEC. 1003.2. NOTE: A SEPARATE |
| PERMIT IS REQUIRED FOR THE INSTALLATION OF THE GREASE |
| INTERCEPTOR. |
| 11) SHOW THE HEIGHT OF THE TEE MANIFOLD AND VENT SLEEVE |
| FROM THE FLOOR OF THE INTERCEPTOR. |
| 12) THE INLET INVERT OF THE GREASE INTERCEPTOR SHALL |
| DISCHARGE A MINIMUM OF 2 1/2 INCHES ABOVE THE LIQUID |
| LEVEL LINE AND THE OUTLET TEE SHALL BE A MINIMUM OF 4 |
| INCHES THAT EXTENDS TO WITHIN 8 INCHES OF THE BOTTOM OF |
| THE TANK PER FL. ADMIN. CODE RULE 64E-6. |
| 13) A SEPARATE PERMIT IS REQUIRED FOR THE BACKFLOW |
| DEVICES. |
| 14) ALL BACKFLOW DEVICES SHALL BE LEAD FREE AND BE ON |
| THE LIST OF APPROVED DEVICES OF THE UNIVERSITY OF |
| SOUTHERN CALIFORNIA'S FOUNDATION FOR CROSS-CONNECTION |
| CONTROL AND HYDRAULIC RESEARCH. |
| 15) A PERMIT IS REQUIRED FROM PALM BEACH COUNTY |
| DEPARTMENT OF ENVIRONMENTAL RESOURCE MANAGEMENT FOR THE |
| FUEL TANKS. |
| 16) SHT. A0.2 - PLUMBING NOTES - THERE ARE SEVERAL |
| NOTES THAT REFER TO THE GENERAL CONTRACTOR PERFORMING |
| THE INSTALLATION OF THE PLUMBING SYSTEM AND BACKFLOWW |
| DEVICE. A GENERAL CONTRACTOR CANNOT PERFORM THIS SCOPE |
| OF WORK UNLESS THEY ARE LICENSED AS A PLUMBING |
| CONTRACTOR PER FL. STATUTE 489.105. THIS NOTE ALSO |
| APPEARS ON SHT.GC-0.1 UNDER "PLUMBING RESPONSIBILITY". |
| CLARIFY. |
| 17) CLARIFY AS TO WHO IS MADISON INDUSTRIES? ARE THEY |
| LICENSED CONTRACTORS IN THE STATE OF FLORIDA? PROVIDE |
| INFORMATION. |
| 18) THE GC SHEET ARE REQUIRED TO BE DIGITALLY SIGNED |
| AND SEALED PER FL. ADMIN. CODE RULE 61G1-16.005. |
| 19) SHTS. GC-2.2, GC-2.3, GC-3.0, GC-3.1, GC-4.0, |
| GC-4.1 BEAR THE SEAL OF THE ARCHITECT BUT THE SEAL IS |
| FOR THE STATE OF GEORGIA. CLARIFY. |
| 20) SHT. IP 200 - DETAIL #10 - PVC AND GALVANIZED PIPE |
| IS NOT APPROVED MATERIAL FOR THE PIPING FOR THE |
| BACKFLOW DEVICE. TYPE "K" OR "L" COPPER, BRASS OR |
| STAINLESS STEEL ARE THE APPROVED MATERIALS PER THE CITY |
| OF WEST PALM BEACH CROSS CONNECTION CONTROL MANUAL. THE |
| DEVICE SHALL BE LOCATED A MINIMUM OF 18 INCHES ABOVE |
| FINISH GRADE TO THE RELIEF VALVE. |
| 21) SHT. P1.1 - MANUFACTURING PLANT INSTALLATION |
| NOTES#1 REFER TO "B.S." FOR THE INSTALLATION OF THE |
| COMPLETE PLUMBING SYSTEM WITHIN THE MODULAR BUILDING. |
| WHO IS "B.S."? CLARIFY. |
| 22) CARBONATED BEVERAGE DISPENSERS SHALL BE EQUIPPED |
| WITH BACKFLOW DEVICES SPECIFICALLY DESIGNED FOR |
| CARBONATION EQUIPMENT AND SHALL COMPLY WITH ASSE 1022. |
| 23) SHT. P1.1 - PIPE INSULATION SHALL COMPLY WITH |
| FBC-ENERGY TABLE C403.2.10. |
| 24) SHT. P1.1 - NOTE #7 - PVC PIPE SHALL BE HUNG AT 4 |
| FEET INTERVALS HORIZONTALLY AND 10 FEET INTERVALS |
| VERTICALLY PER FBC-PLUMBING TABLE 308.5. |
| 25) SHT. P1.1 - NOTES REFER TO THE GENERAL CONTRACTOR |
| PERFORMING PLUMBING WORK. A GENERAL CONTRACTOR MUST BE |
| LICENSED AS A PLUMBING CONTRACTOR TO PERFORM THIS TYPE |
| OF WORK. EITHER REVISE THE NOTE OR REMOVE IT. |
| 26) HAND SINKS IN THE FOOD PREP AREA SHALL BE |
| INDIRECTLY WASTED TO A WASTE RECEPTOR. FBC-PLUMBING |
| SEC.802.1.1 |
| 27) SHT. P2.1 - MASTER TRAP DETAIL - APPEARS TO BE A |
| VERSION OF A CROWN VENT WHICH IS PROHIBITED BY THE |
| FLORIDA PLUMBING CODE. DELETE THIS DETAIL. |
| 28) SHT. P2.2 - THERE IS A FLAT, DRY VENT ON THE END OF |
| THE RUN FOR THE FLOOR SINKS IN THE SALES FLOOR AREA. |
| DRY VENTS CONNECTING TO A HORIZONTAL DRAIN SHALL |
| CONNECT ABOVE THE CENTERLINE OF THE HORIZONTAL DRAIN |
| PIPE.905.3. |
| 29) WHAT TYPE OF WASTE WILL BE DISCHARGING FROM THE |
| COLD PAN (COFFEE) AND COLD PAN ( HOT DOG) DRAINS? |
| 30) WHAT TYPE OF WASTE WILL BE DISCHARGING FROM THE |
| SANDWICH COOLERS, THE BILLET IMPULSE COOLER AND THE |
| COUNTER DRAINS? |
| 31) THE DRAINS FROM THE YOGURT MACHINE AND YOGURT TABLE |
| SHALL DISCHARGE TO THE GREASE WASTE SYSTEM IF THE |
| DISCHARGE CONTAINS ANY YOGURT PRODUCT.FBC-PLUMBING |
| SEC.1003.3.1. CLARIFY. |
| 32) THE 2 INCH VENT BY THE MASTER TRAP IS A FLAT, DRY |
| VENT.DRY VENTS CONNECTING TO A HORIZONTAL DRAIN SHALL |
| CONNECT ABOVE THE CENTERLINE OF THE HORIZONTAL DRAIN |
| PIPE.905.3. |
| 33) CONDENSATE VENTS CANNOT CONNECT TO THE SANITARY |
| VENT SYSTEM PER FBC-PLUMBING SEC.901.4. |
| 34) THE CLEANOUTS ON THE DRAIN LINES UNDER THE BUILDING |
| SHALL BE EXTENDED TO THE FLOOR LEVEL PER FBC-PLUMBING |
| SEC.708.1.10. |
| 35) ACCESS IS REQUIRED FOR THE CLEANOUTS LOCATED BELOW |
| FLOOR. FBC-PLUMBING SEC.708.1.10. |
| 36) SHT. P2.2 - THE HUB DRAINS FOR THE COLD PAN |
| (COFFEE) AND COLD PAN (HOT DOG) APPEAR TOEXCEED THE |
| DISTANCE FROM A VENT PER FBC-PLUMBING SEC.909.1 AND |
| TABLE 909.1. |
| 37) SHT. P3.2 - THE WATER LINE TO THE ICE MACHINE IS |
| LABELED AS FW1 BUT THE ICE MACHINE IS LABELED AS FW2. |
| THE SAME ISSUE OCCURS ON THE WATER LINE TO THE BEVERAGE |
| MACHINE.CLARIFY. |
| 38) A BACKFLOW PREVENTION DEVICE IS REQUIRED ON THE |
| WATER FILTRATION SYSTEM AND THE GLYCOL CHILLER PER |
| FBC-PLUMBING SEC.608.3. THE DEVICE MUST BE INSTALLED AT |
| THE WATER FILTER LOCATION. |
| 39) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| COMBI-OVENS, WATER BOOSTER, RINSE-O-MATIC, FROZEN |
| YOGURT DISPENSER AND POST MIX SODA SYSTEM. A BACKFLOW |
| PREVENTION DEVICE IS REQUIRED ON THE WATER BOOSTER. |
| 40) SHT. P3.2 - SIZE THE COLD WATER BRANCH LINE TO THE |
| FEMALE RESTROOM. |
| 41) BACKFLOW DEVICES ARE REQUIRED ON THE HOSE REEL & |
| RINSE-O-MATIC. DEVICES SHALL COMPLY WITH TABLE 608.1 OF |
| FBC-PLUMBING. |
| 42) SHT. C8 - THERE IS A NOTE ON THE SHEET THAT REFERS |
| TO SHT.C8.1 FOR A BACKFLOW DEVICE DETAIL. THERE IS NO |
| DETAIL ON C8.1. CLARIFY. |
| 43) SHOW THE LOCATION OF THE RINSE-O-MATIC ON THE WATER |
| RISER. WPB AMEND. TO FBC SEC. 107.2.1. |
| 44) SHOW THE LOCATION OF THE GLYCOL CHILLER ON THE |
| EQUIPMENT PLAN AND LIST IT ON THE EQUIPMENT SCHEDULE. . |
| ENSURE ALL EQIPMENT IS LISTED ON THE EQUIPMENT SCHEDULE |
| AND SHOWN ON THE EQUIPMENT PLAN.WPB AMEND. TO FBC SEC. |
| 107.2.1. |
| 45) THE HOT WATER RECIRCULATION SYSTEM SHALL COMPLY |
| WITH FBC-PLUMBING SEC.607.2.1 & FBC-ENERGY |
| SEC.C404.6.1. |
| 46) SHT. C8 SHOWS A 2 INCH WATER SERVICE WITH A 1 1/2 |
| INCH BACKFLOW PREVENTION DEVICE. CLARIFY. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |