Plan Review Notes For Permit 20050529 |
Permit Number |
20050529 |
|
Review Stop |
B |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2020-07-09 14:43:47 | PLAN | | REVIEW COMMENTS | | | | 2ND REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | FBC 107 | | 1) THE GENERATOR PAD ENGINEERING THAT WAS SUBMITTED IS | | NOT ACCEPTABLE FOR THE FOLLOWING REASONS: | | A) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE REQUIRED | | MINIMUM WEIGHT FOR THE 22KW GENERATOR AS 466 LBS. AND | | THE SPECIFICATIONS FOR YOUR GENERATOR HAS A WEIGHT OF | | 445 LBS. | | B) THE SCHEDULE ON THE DRAWINGS SPECIFIES THE ALLOWABLE | | WIND LOAD PRESSURES FOR THE GENERATOR, BUT THE REQUIRED | | WIND LOAD PRESSURES FOR THE SITE IT WILL BE INSTALLED | | ARE NOT PROVIDED. SEE GENERAL NOTE #2 ON THE DRAWING | | THAT STATES THAT THE REQUIRED PRESSURES FOR THE SITE OR | | TO BE DETERMINED BY OTHERS. |
|