Plan Review Notes For Permit 20050511 |
Permit Number |
20050511 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2020-06-03 15:09:31 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE APPLICATION STATES THAT THIS WILL BE A RE-COVER | | RATHER THAN A TEAR OFF. IN ORDER TO DO A RE-COVER THERE | | CAN BE ONLY ONE EXISTING ROOF COVERING AND IT HAS TO BE | | IN GOOD ENOUGH CONDITION TO RECOVER. THE EXISTING ROOF | | WILL HAVE TO BE INSPECTED AND APPROVED BY THE BUILDING | | DEPARTMENT BEFORE IT CAN BE COVERED. FBC 107 | | | | 2) THE W-5 SYSTEM THAT YOU HIGHLITED IN THE FL16709 | | PRODUCT APPROVAL IS FOR NEW CONSTRUCTION OR RE-ROOF | | (TEAR OFF). IT IS NOT FOR RECOVER. ALL OF THE RECOVER | | SYSTEMS IN THIS PRODUCT APPROVAL REQUIRE AN INSULATION | | LAYER. FBC 107..2.1 | | | | 3) REGARDLESS OF THE ROOFING SYSTEM THAT YOU SELECT IT | | WILL HAVE TO BE INSTALLED AS SPECIFIED IN THE PRODUCT | | APPROVAL AND THE REQUIRED DESIGN PRESSURES MUST BE MET. | | FBC R301 | | | | 4) THE VALUE OF $3000.00 APPEARS TO BE LOW. SUBMIT A | | COPY OF THE SIGNED CONTRACT. FBC 109.3 | | | | 5) SPECIFY THE AREA OF THE ROOF AND THE ROOF MEAN | | HEIGHT. FBC 107 | | |
|