Plan Review Notes For Permit 20050450 |
Permit Number |
20050450 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2020-05-18 16:07:03 | ROOFING | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | 1) PRODUCT APPROVAL FOR THE TILE UNDERLAYMENT = PLEASE | | CIRCLE THE ATTACHMENT SYSTEM TO BE USED SHOWN ON THE | | PRODUCT APPROVAL UNDER 5.6 AND 5.6.4. MAKING SURE THE | | WIND DESIGN PRESSURE MEETS THE REQUIRED PRESSURES FOR | | ROOFING ZONES 1 AND 2 | | 2) PRODUCT APPROVAL FOR THE FLAT DECK = PLEASE PROVIDE | | SIGNED AND SEALED ADDITIONAL ATTACHMENT DETAILS FROM AN | | ARCHITECT OR ENGINEER FOR ROOF ZONES 2 AND 3 THAT | | REQUIRE HIGHER WIND DESIGN PRESSURES THAN THE MAXIMUM | | PRESSURE SHOWN FOR THE ROOFING SYSTEM CHOSEN ON THE | | PRODUCT APPROVAL (-60). SEE PRODUCT APPROVAL NOTE | | NUMBER 9. | | 3) SIGNED AND SEALED DETAILS NEED TO BE DIGITALLY | | SIGNED AND SEALED BY THE ENGINEER OR ARCHITECT TO BE | | USED IN ELECTRONIC PLAN REVIEW. | | | | FYI - ENGINEER CANNOT SELF-CERTIFY THE DIGITAL | | SIGNATURE | | 668.003(2) AND (3), F.S. | | (2) A PROFESSIONAL ENGINEER UTILIZING A DIGITAL | | SIGNATURE TO ELECTRONICALLY SIGN AND SEAL ENGINEERING | | PLANS, | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS SHALL HAVE | | THEIR IDENTITY AUTHENTICATED BY A CERTIFICATION | | AUTHORITY. | | | | |
|