Date |
Text |
2020-07-27 13:57:47 | 07/27/20 2ND GAS REVIEW**DENIED** WITH COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. THE GAS TO THE GENERATOR IS 1/2 LBS BUT THE METER |
| DOES NOT SPECIFY IF IT IS 2 PSI OR 1/2 LBS, PLEASE |
| LABEL PER THE 2017 FBC RES. SEC. G2413.2. |
| |
| 2. THE GENERATOR IS 16 KW AT FULL LOAD BTU 309 ON SPECS |
| AND YOU HAVE 240 BTU'S ON ISOMETRIC PLEASE CHANGE TO |
| REFLECT TOTAL BTU'S AND RECALCULATE PER THE 2017 FBC |
| RES. SEC. G2413. |
| |
| 3. PLEASE SHOW AND LABEL DRIP LEG, SHUT OFF VALVE, |
| UNION AND REGULATOR PER THE 2017 FBC RES. SEC. |
| G2401.1.3. |
| |
| 4. THE GENRAC REQUIRES 5" TO 7" WATER COLUMN THIS NEED |
| TO BE REGULATED, PLEASE SUBMIT MANUFACTURER'S |
| SPECIFICATIONS FOR THE PRESSURE REGULATORS. REGULATORS |
| INSTALLED ON THE EXTERIOR OF THE BUILDING SHALL BE |
| APPROVED FOR OUTDOOR INSTALLATION PER THE 2017 FBC RES. |
| SEC. G2421.1. |
| |
| 5. PEASE DELETE THE COMMENT OF THE TANK AT BOTTOM OF |
| PAGE PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 |
| INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING INSPECTOR / |
| PLUMBING PLAN REVIEW |
| AVAILABLE FROM 1:00 PM TO 4:00 PM |
| [email protected] |
| 561-805-6720 |
| |