Plan Review Notes
Plan Review Notes For Permit 20040366
Permit Number 20040366
Review Stop M
Sequence Number 2
Notes
Date Text
2020-05-14 16:23:272ND REVIEW FBC-2017 MECHANICAL
 PERMIT #20040366
 5/14/2020
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED
 BASED ON THE RESUMBITTED PLANS AND THE NARRATIVE
 RESPONSES BY THE ENGINEER OF RECORD, THE 1ST REVIEW
 COMMENTS LISTED BELOW WILL BE MARKED AS PASSED OR
 FAILED.
  
 1) PASSED- DEFERRED SUBMITTAL ACCEPTED. PROVIDE A
 SUBMITTAL PACKAGE THAT INCLUDES MANUFACTURER'S
 SPECIFICATIONS AND INSTALLATION GUIDELINES FOR THE
 BOILERS, PUMPS, EXPANSION TANK, CONTROL VALVES, RELIEF
 VALVES, CHEMICAL FEEDER, CHEMICAL NEUTRALIZERS, VENT
 FLUE AND VENT CAP, COMBUSTION AIR DUCTS, GAS AND
 HYDRONIC PIPING, AND THE GAS REGULATORS AND SHUT OFF
 VALVES- SECTION 107.2.1 WPB. REVIEW ALL REQUIRED
 COMPLIANCES AND UL LISTINGS FOR THE PRODUCTS AS NOTED
 ON THE SPECIFICATIONS SHEETS M101, 102, & 103 AS THEY
 WILL BE CROSS CHECKED IN THE 2ND REVIEW. THE DESIGN
 PROFESSIONAL OF RECORD SHALL PROVIDE APPROVAL STAMPS ON
 EACH SUBMITTAL DOC, OR PROVIDE A STAMPED COVER PAGE
 WITH AN INDEX LISTING ALL PRODUCT SUBMITTALS.
 A) PASSED- DEFERRED SUBMITTAL. PLEASE NOTE THE GAS
 BOILER SPECIFICATIONS SHALL INDICATE THAT THE UNITS ARE
 LISTED IN ACCORDANCE WITH THE REQUIREMENTS OF ANSI
 Z21.13 OR UL 795, AND DESIGNED AND CONSTRUCTED IN
 ACCORDANCE WITH THE REQUIREMENTS OF ASME CSD-1 AND AS
 APPLICABLE, THE ASME BOILER AND PRESSURE VESSEL CODE,
 SECTIONS I, II, IV, V AND IX AND NFPA 85- SECTION 631.1
 FBC FG AND SECTION 1004.1 FBC M.
 B) PASSED- DEFERRED SUBMITTAL. COMMISSIONING OF THE
 BOILERS WILL REQUIRED AS NOTED UNDER ITEM 3.05 ON SHEET
 M103 WHICH LISTS THE AIR AND WATER TESTING AND
 BALANCING. COPIES OF THE TESTING REPORTS WILL BE
 REQUIRED FOR FINAL MECHANICAL APPROVAL- SECTION C408.2
 FBC EC.
 C) PASSED- DEFERRED SUBMITTAL. THE BOILER
 SPECIFICATIONS SHALL INDICATE THAT THE UNITS HAVE BEEN
 TESTED OR WILL BE TESTED TO A MAXIMUM LEVEL OF 50 PPM
 OF CARBON MONOXIDE PER OSHA GUIDELINES- SECTION
 1004.2.1 FBC M.
  
 2) FAILED. SHEET M401: PROVIDE THE EFFICIENCY RATINGS
 OF THE BOILERS IN THE EQUIPMENT SCHEDULES- SEE TABLE
 404,2 FBC EC.
  
 3) PASSED- DEFERRED SUBMITTAL. M401: VERIFY THE BOILER
 SERVICE WATER SYSTEM WILL BE CAPABLE OF AUTOMATIC
 TEMPERATURE RESET AND AUTOMATIC VARIABLE FLUID FLOW-
 SEE SECTION C403.4.2.2 FBC EC.
  
 4) PASSED- DEFERRED SUBMITTAL. M401: INDICATE THE
 BOILER TURNDOWN RATIO AS REQUIRED BY SECTION C403.4.2.5
 FBC EC.
  
 5) FAILED. WORKING CLEARANCES AT FRONTS, SIDES, REARS,
 AND IN BETWEEN THE BOILERS NOT PROVIDED. PLEASE PROVIDE
 FRONT AND TOP VIEW DRAWINGS OR DIAGRAMS OF THE BOILERS
 THAT SHOW A) REQUIRED WORKING CLEARANCES AS NOTED IN
 SECTIONS 1004.3 & 1004.3.1 FBC M. B) POTABLE WATER
 SUPPLY PIPING CONNECTION AND LOCATION OF BACKFLOW
 PREVENTERS AND SHUTOFF VALVES- SECTIONS 1005.1 &
 1005.2. C) WATER DISTRIBUTION PIPING AND CONNECTIONS
 AND VALVE LOCATIONS- 1005.2 D) LOCATIONS AND
 CONNECTIONS OF SAFETY RELIEF VALVES, PRESSURE RELIEF
 VALVES, DISCHARGE PIPING AND DISCHARGE LOCATIONS-
 SECTIONS 1006.2,1006.3, 1006.4, 1006.5, 1006.6, AND
 1006.7. E) LOCATION OF THE EXPANSION TANK- SECTION 1009
 FBC M. E) CONNECTION LOCATIONS OF THE GAS PIPING AND
 REGULATOR, COMBUSTION AIR DUCTS, AND VENT DUCT- SECTION
 107.2.1 WPB.
  
 6) PASSED. SHEET M501: SHOW THE LOCATION OF THE
 REQUIRED FLOOR DRAIN FOR THE BOILERS- SECTION 1004.6
 FBC M.
  
 7) PASSED. M501: SHOW THE GAS PIPING RUN INTO THE
 BOILER ROOM- SECTION 107.2.1 WPB.
  
 8) FAILED. GAS DRAWING DOES NOT SHOW TOTAL DEVELOPED
 LENGTH OF THE SYSTEM, TYPE OF PIPINGS, TOTAL BTUH GAS
 LOAD OF THE SYSTEM, CUT LENGTHS OF PIPINGS, DELIVERY
 PRESSURES AT THE METER AND AT REGULATORS, GAS PIPE
 SIZING TABLES, LOCATIONS OF DRIP LEGS, UNIONS. PROVIDE
 A GAS ISOMETRIC DRAWING THAT SHOWS THE TYPE AND
 DIAMETERS OF PIPING, THE MEASUREMENTS OF EACH CUT
 LENGTH OF PIPE, THE TOTAL DEVELOPED LENGTH OF THE
 PIPING RUN FROM THE POINT OF DELIVERY AT THE METER TO
 THE MOST REMOTE OUTLET IN THE BUILDING AND TO THE
 BOILERS; GAS DELIVERY PRESSURE OF THE SYSTEM AT THE
 METER AND AT EACH STEPDOWN REGULATOR; LOCATIONS OF
 REQUIRED SHUTOFF VALVES, AND THE BTUH LOADS OF THE NEW
 BOILERS, AND ALL OTHER GAS-FIRED APPLIANCES AND
 EQUIPMENT BEING SERVED BY THE SYSTEM- SECTIONS 402.2
 AND 402.3 FBC FG. PLEASE INDICATE WHICH PIPE SIZING
 TABLES WERE USED IN THE DESIGN- SECTION 402.3.
 A) FAILED. CONCERNING THE REGULATORS PLEASE REFER TO
 SECTIONS 410.1, 410.2, & 410.3 FBC FG FOR LINE AND MP
 REGULATOR INSTALLATION AND VENTING REQUIREMENTS. PLEASE
 VERIFY SUBMITTALS ARE COMPLIANT AND SHOW ALL REGULATOR
 AND SHUTOFF VALVES IN THE ISOMETRIC DRAWING, AND
 REGULATOR VENT RUNS AND TERMINATION LOCATIONS WHERE
 REQUIRED.
  
 9) FAILED. A) THE VENT SIZING CALCULATIONS WERE NOT
 PROVIDED- SECTION 501.14 FBC FG. B) SHEETS M-301 &
 M-903 SHOW THE VENT ROOF FREESTANDING ABOVE THE ROOF.
 SHEET M-501 INDICATES THE VENT TO BE IN A CHIMNEY
 ENCLOSURE- WHICH IS IT? , IF THE VENT IS FREESTANDING,
 SHOW THE ACTUAL HEIGHT OF THE VENT FLUE ABOVE THE ROOF
 AND PROVIDE ENGINEERING FOR ANCHORING THE FLUE TO THE
 ROOF STRUCTURE TO RESIST WIND PRESSURES- SECTION
 301.15- FBC M. C) INDICATE THE REQUIRED CLEARANCE FROM
 THE VENT PENETRATION TO THE COMBUSTIBLE ROOFING
 MATERIAL. D) PROVIDE A SUBMITTAL FOR THE VENT FLUES AND
 COMBUSTION AIR DUCTS OR REQUEST DEFERRED. PROVIDE A
 VENT FLUE DIAGRAM THAT SHOWS THE LENGTHS OF THE
 CONNECTORS, HORIZONTAL AND VERTICAL RUN LENGTHS, TOTAL
 RUN LENGTH OF THE SYSTEM, AND LOCATIONS OF OFFSETS,
 FITTINGS ETC. PER THE NOTES ON SHEET M102 THE PROPOSED
 SYSTEM REQUIRES ENGINEERED SIZING CALCULATIONS WHICH
 SHALL ACCOMPANY THE VENTING DIAGRAM- SEE SECTION
 506.6.9.3 FBC FG. PLEASE INDICATE THE "VENTING
 APPLIANCE CATEGORY" - I, II, III, OR IV THAT THE SYSTEM
 IS BEING DESIGNED FOR, AND IF THE SYSTEM IS POSITIVE OR
 NEGATIVE AND PRODUCES CONDENSATION- SEE SECTION 202 FBC
 FG. CURRENTLY, A THOROUGH REVIEW OF THE SYSTEM CANNOT
 BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND ADDITIONAL
 SPECIFICATIONS AND INFORMATION- SECTION 107.2.1 WPB.
 PLEASE REFER BACK TO COMMENT #1 FOR SUBMITTAL
 REQUIREMENTS AND REQUIRED UL LISTING AND LABELING. A)
 M502: REFER TO SECTION 503.8 FBC FG AND SHOW THE
 REQUIRED CLEARANCES FROM THE VENT FLUE TERMINATION TO
 MECHANICAL AND GRAVITY AIR INTAKES OR ANY OPERABLE
 OPENINGS INTO THE BUILDING.
  
 10) PASSED. PROVIDE A COMBUSTION AIR DUCT DIAGRAM THAT
 SHOWS THE LENGTHS OF THE CONNECTORS, HORIZONTAL AND
 VERTICAL RUN LENGTHS, TOTAL RUN LENGTH OF THE SYSTEM,
 AND LOCATIONS OF OFFSETS, FITTINGS ETC.- SECTION 304.1
 AND 304.11 FBC FG. CURRENTLY, A THOROUGH REVIEW OF THE
 SYSTEM CANNOT BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND
 ADDITIONAL SPECIFICATIONS AND INFORMATION- SECTION
 107.2.1 WPB. PLEASE REFER BACK TO COMMENT #1 FOR
 SUBMITTAL REQUIREMENTS AND REQUIRED UL LISTING AND
 LABELING.
  
 11) PASSED. M201: THE SCOPE OF WORK NOTES INDICATES
 DEMOLITION OF AIR CONDITIONING UNITS, DUCTS, TERMINAL
 BOXES ETC. HOWEVER THE DRAWINGS TO NOT SHOW ANY AC
 DEMOLITION OR REWORK. PLEASE PROVIDE THE DRAWINGS-
 SECTION 107.2.1 WPB.
  
 12) PASSED. M401: PLEASE PLACE A NOTE THAT THE WELDER'S
 CERTIFICATES AND WELDING PROCEDURES SHALL BE ONSITE AT
 TIME OF INSPECTION- SECTION 107.2.1 WPB.
  
 13) PASSED- SEE NOTE. PROVIDE UL LISTED FIRE STOPPING
 ASSEMBLIES FOR THE PENETRATIONS OF THE VENT FLUE, AND
 COMBUSTION AIR DUCTS THROUGH THE FIRE RATED WALLS AND
 FLOOR CEILING ASSEMBLIES- SECTION 714 FBC B. NOTE: THE
 PIPE PENETRATON FIRESTOPPING DETAIL ON M-903 DOES NOT
 INDICATE IT IS A UL LISTED AND LABELED ASSEMBLY.
  
 14) PASSED. INDICATE THE TYPE AND THICKNESSES OF THE
 BOILER SERVICE WATER PIPING INSULATIONS AND PROVIDE A
 PRODUCT SUBMITTAL- SEE TABLE C403.2.10 FBC EC.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET