2020-04-10 14:34:47 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| |
| |
| 1) THERE IS NO CLEAR SCOPE OF WORK. THE COVER PAGE |
| INDICATES BOILER UPGRADE. |
| |
| WITH MULTIPLE DEMO PLAN SHEETS, PLEASE PROVIDE A SCOPE |
| OF WORK FOR CLRIFICATION PURPOSES. |
| |
| PLEASE INCLUDE WHAT IS/WILL BE EXISTING AND WHAT |
| IS/WILL BE NEW. |
| |
| |
| |
| 2) THERE IS NO INDICATIONS OF COMPLIANCE WITH ANY LIFE |
| SAFETY CODE. |
| |
| THE PROPOSED SHALL COMPLY WITH THE FLORIDA FIRE |
| PREVENTION CODE, 6TH ED AND ALL APPLICABLE, INCLUDING, |
| BUT NOT LIMITED TO, NFPA 85 |
| BOILER AND COMBUSTION SYSTEMS HAZARDS CODE, 2015 |
| EDITION. |
| |
| WITH NOT FULLY KNOWING THE SCOPE AND PER # 1 ABOVE, IT |
| IS UNCLEAR IF THERE IS COMPLIANCE WITH NFPA. |
| |
| PLEASE REVIEW AND ENSURE COMPLIANCE AND PROVIDE AN |
| APPLICABLE NOTE OF ACKNOWLEDGEMENT. |
| |
| |
| |
| 3) THERE ARE NO SPEC/EQUIPMENT SHEETS PROVIDED. |
| |
| PLEASE REVIEW AND PROVIDE AS APPLICABLE FOR REVIEW AND |
| CONFIRMATION WITH # 1 & 2 ABOVE. |
| |
| |
| |
| 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |
| |
| |
| |
| |
| |
| CHAPTER 1 ADMINISTRATION |
| 1.1* SCOPE. THIS CODE APPLIES TO THE FOLLOWING: |
| (1) SINGLE BURNER BOILERS, MULTIPLE BURNER BOILERS, |
| STOKERS, |
| AND ATMOSPHERIC FLUIDIZED BED BOILERS WITH A FUEL INPUT |
| RATING OF 3.7 MWT (12.5 MILLION BTU/HR) OR GREATER |
| (2) PULVERIZED FUEL SYSTEMS AT ANY HEAT INPUT RATE |
| (3) FIRED OR UNFIRED STEAM GENERATORS USED TO RECOVER |
| HEAT |
| FROM COMBUSTION TURBINES [HEAT RECOVERY STEAM |
| GENERATORS |
| (HRSGS)] AND OTHER COMBUSTION TURBINE EXHAUST SYSTEMS |
| AT ANY HEAT INPUT RATE |
| 1.1.1 THIS CODE COVERS DESIGN, INSTALLATION, OPERATION, |
| MAINTENANCE, |
| AND TRAINING. |