2020-04-10 13:43:40 | 1) THE SURVEY SHOWS A NEW GAS METER BUT THE GAS |
| APPLICATION STATES THAT THE GENERATOR WILL BE |
| CONNECTING TO AN EXISTING GAS LINE. CLARIFY. IF A NEW |
| METER IS TO BE INSTALLED THE DESCRIPTION OF WORK ON THE |
| GAS SUB APPLICATION SHALL BE REVISED. WPB AMEND. TO FBC |
| SEC. 107.2.1. |
| 2) THE GAS PLAN CALLS OUT A TEE ON THE GAS LINE BUT NO |
| TEE IS SHOWN. CLARIFY. |
| 3) A SHUTOFF VALVE IS REQUIRED IMMEDIATELY UPSTREAM OF |
| THE GAS REGULATOR. THE GAS RISER SHOWS IT DOWNSTREAM. |
| 2017 FBC-FUEL GAS SEC.409.4. |
| 4) SUBMIT MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR |
| THE REGULATOR. 2017 FBC-FUEL GAS SEC. 410.1. |
| 5) THE PLANS INDICATE AN EXISTING GAS METER AND CITY |
| RECORDS SHOW AN EXISTING GAS SYSTEM FOR THIS ADDRESS. |
| THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED |
| INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE |
| EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE |
| EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE |
| OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM |
| THAT SHOWS THE TYPE OF THE EXISTING APPLIANCES THE BTU |
| LOAD OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE |
| TO EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST |
| LENGTH OF PIPING FROM THE POINT OF DELIVERY TO THE MOST |
| REMOTE OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. |
| FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR |
| SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| PLUMBING PLAN REVIEW |
| 561-805-6692 |
| [email protected] |
| |