2021-09-27 10:52:58 | NEW RESIDENTIAL HI RISE "FOUNDATION ONLY" |
| REVIEWED BY ROGER MCPHERSON |
| 561-805-6716 |
| [email protected] |
| |
| CORRECTIONS NEEDED - INCLUDED ARE COMMENTS PROVIDED BY |
| ROBERT MCDOUGAL THAT WERE NOT CORRECTED |
| |
| 1) DO NOT SEE THIS STATEMENT ON ALL OF THE PLANS - |
| THRESHOLD BLDG. REQUIRED STATEMENT: W.P.B. AMENDMENT |
| 110.8.4.4 ALL PLANS FOR THE BUILDING WHICH ARE REQUIRED |
| TO BE SIGNED AND SEALED BY THE ARCHITECT OR ENGINEER OF |
| RECORD CONTAIN A STATEMENT THAT, TO THE BEST OF THE |
| ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND |
| SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM |
| BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS |
| AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH |
| THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. |
| |
| 2) DRAWINGS - (LS1.107) AND (LS1.104) STILL SHOW BOTH |
| EGRESS PATHS THROUGH THE ELEVATOR LOBBY - SOME FLOOR |
| PLANS NEED TO COMPLY WITH FBC 1016.2 EGRESS THROUGH |
| INTERVENING SPACES. |
| EGRESS THROUGH INTERVENING SPACES SHALL COMPLY WITH |
| THIS SECTION. |
| 1.EXIT ACCESS THROUGH AN ENCLOSED ELEVATOR LOBBY IS |
| PERMITTED. ACCESS TO NOT LESS THAN ONE OF THE REQUIRED |
| EXITS SHALL BE PROVIDED WITHOUT TRAVEL THROUGH THE |
| ENCLOSED ELEVATOR LOBBIES REQUIRED BY SECTION 3006. |
| |
| 3) PAGE 8 OF THE SPECIAL INSPECTOR AGREEMENT PACKAGE |
| FORM NEEDS TO BE FILLED OUT - THE CONTRACTOR AND THE |
| OWNER OF THE PROJECT SIGNATURES FORM. |
| |
| 4) I HAVE REMOVED THE ELEVATION CERTIFICATE FROM |
| PROJECTDOX - ELEVATION CERTIFICATE IS FOR THE BUILDING |
| ONLY - THE ELEVATION CERTIFICATE IS ONLY NEEDED IF THE |
| BUILDING IS IN THE AE FLOOD ZONE. |
| ELEVATION CERTIFICATE - ITEM B8. FLOOD ZONE(S). ENTER |
| THE FLOOD ZONE, OR FLOOD ZONES, IN WHICH THE BUILDING |
| IS LOCATED. ALL FLOOD ZONES |
| CONTAINING THE LETTER "A" OR "V" ARE CONSIDERED SPECIAL |
| FLOOD HAZARD AREAS. THE FLOOD ZONES ARE A, AE, A1?A30, |
| V, |
| VE, V1?V30, AH, AO, AR, AR/A, AR/AE, AR/A1?A30, AR/AH, |
| AND AR/AO. EACH FLOOD ZONE IS DEFINED IN THE LEGEND OF |
| THE FIRM PANEL ON WHICH IT APPEARS. |
| |
| |
| WILL NEED BUILDING OFFICIAL APPROVAL FOR THE FOUNDATION |
| ONLY - FBC WPB 105.13 PHASED PERMIT APPROVAL. AFTER |
| SUBMITTAL OF THE APPROPRIATE CONSTRUCTION DOCUMENTS, |
| THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT |
| FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER |
| PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION |
| DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE |
| HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE |
| FOUNDATION OR OTHER PARTS OF A |
| BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN |
| RISK WITH THE BUILDING OPERATION AND |
| WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE |
| STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE |
| REQUIRED TO MEET THE REQUIREMENTS OF THE TECHNICAL |
| CODES. THIS PROVISION IS ONLY FOR THE |
| FLORIDA BUILDING CODE. ALL OTHER AGENCY APPROVALS |
| NECESSARY FOR CONSTRUCTION MUST BE SECURED |