2021-08-10 17:11:02 | FAILED |
| |
| PROVIDE WRITTEN RESPONSES TO PLANS. |
| |
| 1) THE MINOR PLANNED DEVELOPMENT AMENDMENT REVIEWED BY |
| STAFF DID NOT PASS PLANNING AS THE BUILDING HAS SHIFTED |
| AND NO LONGER MEETS MANY OF THE MINIMUM SETBACK |
| REQUIREMENTS. ZONING WILL NOT PASS THE FOUNDATION |
| PERMIT UNTIL THE MINOR PLANNED DEVELOPMENT AMENDMENT |
| PASSES. ALL PLANS RESUBMITTED WITH THIS PERMIT MUST |
| MATCH THE PLANS APPROVED AS PART OF THE MINOR PLANNED |
| DEVELOPMENT AMENDMENT. PREVIOUSLY RAISED COMMENTS FOR |
| THIS PERMIT THAT WILL BE COVERED AS PART OF THE MINOR |
| PLANNED DEVELOPMENT AMENDMENT REVIEW/APPROVAL HAVE BEEN |
| REMOVED. |
| |
| 2) UPDATED COMMENT: RESOLUTION 13-19, WHICH APPROVED |
| THE PROJECT INCLUDED THE REQUIREMENT THAT CERTAIN ITEMS |
| REQUIRED PRIOR TO THE SUBMITTAL OF THE BUILDING PERMIT |
| FOR SITE IMPROVEMENTS, WHICH INCLUDES THE FOUNDATION |
| PERMIT. PROVIDE EVIDENCE THAT THE FOLLOWING HAVE BEEN |
| COMPLETED: |
| |
| A. ABANDON OR RELOCATE THE FPL EASEMENT ALONG THE SOUTH |
| PROPERTY LINE. THE DEVELOPER, BASED ON DISCUSSIONS WITH |
| FPL, PRESENTED A TEMPORARY POWER ROUTING PLAN TO CITY |
| STAFF; HOWEVER, THE FINAL PLAN AND FPL'S SIGN OFF ARE |
| NOT INCLUDED WITH THE RESUBMITTAL. SHEET E1.050 DOES |
| NOT SPECIFY WHEN THE EASEMENT WILL BE ABANDONED. |
| |
| 3) REPEAT COMMENT: PROVIDE INFORMATION ON THE PILING |
| INSTALLATION: RESOLUTION 13-19 REQUIRES THAT THE |
| PROJECT SHALL NOT USE HYDRAULIC HAMMERS TO SET |
| FOUNDATION PILES. IF FOUNDATION PILES ARE PROPOSED THEY |
| SHALL BE AUGURED, DRILLED, VIBRATED, OR PRESSED INTO |
| PLACE. SHEET PILING MAY BE INSTALLED USING VIBRATORS, |
| HYDRO JETTING, OR HYDRAULIC JACK PRESSING EQUIPMENT TO |
| STABILIZE THE PERIMETER OF THE SITE TO ACCOMMODATE THE |
| EXCAVATION AND CONSTRUCTION OF THE SUBGRADE BASEMENT |
| AND RETAINING WALLS. |
| |
| 4) REPEAT COMMENT: PROVIDE INFORMATION ON THE REQUIRED |
| CONDITION SURVEY: RESOLUTION 13-19 REQUIRES THAT THE |
| DEVELOPER SHALL PERFORM A CONDITION SURVEY OF THE |
| ADJOINING PROPERTIES PRIOR TO THE COMMENCEMENT OF ANY |
| CONSTRUCTION OR DEMOLITION ACTIVITIES. THE DEVELOPER |
| SHALL CONFORM TO THE APPROPRIATE INDUSTRY STANDARDS |
| APPROVED BY THE CITY'S BUILDING DIVISION IN MONITORING |
| THE VIBRATION EFFECTS ON THE ADJOINING PROPERTIES; THIS |
| MAY INCLUDE, BUT IS NOT LIMITED TO, THE PLACEMENT OF |
| SEISMIC METERS, INSPECTIONS, AND SIMILAR ACTIVITIES. |
| |
| 5) EV PROVISIONS - ZONING STAFF HAS REVIEWED AND NEEDS |
| CLARIFICATION NARRATIVE ON THE EV PROVISION. COMMENTS |
| BELOW MAY CHANGE BASED ON THE NARRATIVE. THE NARRATIVE |
| SHALL VERIFY THE RESOLUTION NO. 13-19 EV REQUIREMENTS. |
| |
| A. THE B1 ELECTRIC PLANS DO NOT SHOW EV LEVEL 1 |
| CIRCUITS TO THE GARAGE SPACES ALONG THE SOUTH WALL. |
| PLEASE EXPLAIN. |
| |
| B. IT APPEARS THAT THE GUEST SPACES ARE ONLY GETTING EV |
| LEVEL 1, INSTEAD OF THE LEVEL 2 THAT ARE REQUIRED. NOTE |
| ONLY TWO SPACES ARE REQUIRED TO HAVE EV LEVEL 2. |
| |
| 4) REPEAT COMMENT: THE SURVEY PROVIDED WITH THE PERMIT |
| IS NOT THE LATEST SURVEY. PROVIDE THE CORRECT SURVEY. |
| |
| 5) REPEAT COMMENT: THE SITE PLAN NEEDS TO INCLUDE ALL |
| THE SETBACK DIMENSIONS TO THE ELEMENTS OF THE SITE THAT |
| ARE PART OF THE FOUNDATION. |
| |
| 8) THE ABOVE GRADE IMPROVEMENTS REQUIRE REVIEW AS |
| SEPARATE PERMITS WITH PLANS: |
| |
| A. THE WALLS, FENCES, GATES AND COLUMNS REQUIRE A |
| SEPARATE PERMIT WITH PLANS. |
| B. HARDSCAPE, INCLUDING PAVERS, ARTIFICIAL TURF, DOG |
| PARK ITEMS, BENCHES/PLAZA AREA, ETC. |
| C. LANDSCAPE |
| D. IRRIGATION |
| E. GENERATOR - PLEASE NOTE THAT THE FULL HEIGHT OF THE |
| GENERATOR DOES NOT APPEAR TO BE SCREENED AS REQUIRED BY |
| RESOLUTION NO. 13-19. |
| F. WATER FEATURES |
| G. PARKING STRIPING |
| H. SITE LIGHTING, INCLUDING BOLLARDS, NOTE: SINCE |
| ACACIA ROAD IS A SEPARATE PARCEL, IT REQUIRES ITS OWN |
| PERMIT FOR THE LIGHTING, BUT MAY BE INCLUDED ON ONE SET |
| OF PLANS FOR BOTH PERMIT NUMBERS. PHOTOMETRIC PLANS ARE |
| REQUIRED WITH THE PERMITS. |
| I. BICYCLE RACKS, INCLUDES THE BICYCLE STORAGE ROOM. |
| |
| 9) ACACIA ROAD IS A SEPARATE PARCEL. ALL PLANS SHOWING |
| THE ACACIA ROAD WORK ARE TO BE REVIEWED AND APPROVED |
| UNDER A SEPARATE PERMIT. |
| |
| CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| [email protected] |
| |