Plan Review Notes For Permit 20030124 |
Permit Number |
20030124 |
|
Review Stop |
B |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2020-04-06 10:39:39 | PETER E VALENTI | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6673 | | | | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) | | FBC B = FBC BUILDING | | FBC EB = FBC EXISTING BUILDING | | FBC A = FBC ACCESSIBILITY | | FBC EC = FBC ENERGY CONSERVATION | | FBC R = FBC RESIDENTIAL | | FBC M = FBC MECHANICAL | | | | BUILDING PLAN REVIEW DENIED: | | | | FBC B 107.2.2, AS PER LAST BUILDING REVIEW ITEM #5; THE | | INFORMATION ON SHEET G-103B NEEDS TO BE CORRECTED. | | PLEASE CHANGE THE CONSTRUCTION TYPE LISTED IN TYPES OF | | CONSTRUCTION (A) CH.6, LAST COLUMN AT TOP ROW SHOWS | | TYPE 2B. THE FIRST COLUMN SHOWS TYPE 1B, THESE TWO | | COLUMNS NEED TO MATCH. | | | | | | | | | | NOTE: AS PER LAST REVIEW, NO RESPONSE NEEDED FOR | | PROVISOS THEY WILL BE | | ADDED TO PLANS BEFORE BEING ISSUED. | | | | A) PROVIDE PRODUCT APPROVAL FOR ROOF HATCH AND LADDER | | WITH 16 SQ. FT MINUMUM OPENING | | AS REQUIRED BY FBC 1011.12 AND 1011.12.1 | | | | B) ENGINEERING FOR HANDRAILS AND GUARDRAILS. | | | | C) SUBMITTAL TO INCLUDE ANY PRODUCT APPROVALS INCLUDING | | WINDOWS, STOREFRONT AND DOORS. | | | | D) ROOFING PRODUCT APPROVALS TO BE SUBMITTED WITH SUB | | PERMIT APPLICATION. | | | | E) I) AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED | | PRIOR TO C.O. | | | | CONTACT WITHIN 90 DAYS OF PERMIT ISSUANCE. | | F) 5) CONSTRUCTION HOURS ? 7AM TO 7PM MON?FRI, 8AM TO | | 8PM SAT?SUN | | | | | | |
|