Date |
Text |
2020-03-03 15:38:26 | PERMIT 20020952 - UNDERGROUND FIBER N. CONGRESS MCI |
| PROJECT #1803BDBS.29 |
| |
| PLEASE SEE THE LIST BELOW FOR AN ANALYSIS OF THE |
| DEFICIENCIES IN INFORMATION REQUIRED BY SECTION 78-401 |
| OF THE CITY OF WEST PALM BEACH CODE AS PART OF THE |
| COMMUNICATION FACILITIES PLACEMENT PERMIT APPLICATION. |
| THE DEFICIENT INFORMATION MUST BE PROVIDED FOR STAFF TO |
| REVIEW THE PERMIT APPLICATION. PLEASE NOTE THAT STAFF |
| HAS ALSO INCLUDED SOME SUBSTANTIVE REVIEW COMMENTS, |
| THAT WHILE NOT RESULTING IN A DEFICIENT APPLICATION, |
| NEED TO BE ADDRESSED OR THE PERMIT WILL NOT BE |
| APPROVED. |
| |
| 1) THE ENGINEERING PLANS SHOW ELEMENTS OF THE PROJECT |
| BEING INSTALLED ON PRIVATE PROPERTY WHICH IS NOT |
| PERMITTED FOR FIBER THAT IS PART OF A COMMUNICATION |
| FACILITY WITHIN THE RIGHT-OF-WAY. |
| |
| A. THE AREA THAT IS SHOWN AS THE M CANAL IS A FEE |
| PARCEL OWNED BY THE CITY OF WEST PALM BEACH, NOT A |
| RIGHT-OF-WAY AND MAY NOT BE USED TO RUN FIBER. THE |
| FIBER MUST BE IN THE RIGHT-OF-WAY. NOTE: NO |
| VERIFICATION WAS PROVIDED THAT YOU HAVE PERMISSION TO |
| ENCROACH ON CITY PROPERTY. |
| |
| B. 2130 ECHO LAKE DRIVE AND 4441 NORTH CONGRESS AVENUE |
| ARE PRIVATE PROPERTIES WHICH MAY NOT HAVE A HANDHOLE |
| INSTALLED ON THEM. THE HANDHOLE MUST BE IN THE |
| RIGHT-OF-WAY. NOTE: NO VERIFICATION OF THE UTILITY |
| EASEMENT SHOWN ON THE ENGINEERING PLAN WAS PROVIDED. |
| |
| C. 2135 PINEHURST DRIVE AND 4400 NORTH CONGRESS AVENUE |
| ARE PRIVATE PROPERTIES WHICH MAY NOT BE USED TO RUN THE |
| FIBER THAT IS PART OF A COMMUNICATION FACILITY WITHIN |
| THE RIGHT-OF-WAY. THE FIBER MUST BE IN THE |
| RIGHT-OF-WAY. NOTE: NO VERIFICATION OF THE UTILITY |
| EASEMENT SHOWN ON THE ENGINEERING PLAN WAS PROVIDED. |
| |
| 2) SURVEY - THE SURVEY THAT WAS PROVIDED NEEDS TO BE AT |
| A LEGIBLE SIZE. STAFF IS UNABLE TO MAKE OUT ANY |
| INFORMATION ON THE SURVEY THAT WAS PROVIDED. |
| |
| A. THE SURVEY MUST CLEARLY SHOW THE RIGHT-OF-WAY LINE |
| AND THE SIDEWALK. |
| |
| B. ALL UNDERGROUND UTILITIES NEED TO BE PROVIDED ON THE |
| SURVEY. |
| |
| C. THE ENGINEERING PLANS MUST SHOW THE SAME CONDITIONS |
| AS THE SURVEY, SO THAT STAFF CAN VERIFY THAT NONE OF |
| THE PROPOSED WORK (MARKER POLES, HANDHOLDS OR CONDUIT |
| IS BEING INSTALLED ON PRIVATE PROPERTY. |
| |
| 3) TIMETABLE-? YOU ARE REQUIRED TO PROVIDE THE |
| ESTIMATED TIMETABLE FOR CONSTRUCTION OF THE PROJECT OR |
| EACH PHASE THEREOF. |
| |
| 4) EVIDENCE OF INSURANCE COVERAGE - PROVIDE EVIDENCE OF |
| THE INSURANCE COVERAGE REQUIRED UNDER SECTION 78-406 OF |
| THE CITY CODE. |
| |
| 5) POLE STYLE - PLEASE NOTE THAT THE FUTURE POLES ARE |
| REQUIRED TO MEET THE CITY CONCEALMENT STANDARDS |
| OUTLINED IN SECTION 78-411 OF THE CITY CODE. |
| |
| 6) ELECTRONIC FORMAT OF SUBMITTAL - A COPY OF ALL OF |
| THE SUBMITTAL MATERIAL MUST BE SUBMITTED IN ELECTRONIC |
| FORMAT. |
| |
| CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| [email protected] |
| |