Plan Review Notes For Permit 20020422 |
Permit Number |
20020422 |
|
Review Stop |
B |
Sequence Number |
4 |
|
Notes |
Date |
Text |
2020-03-16 16:10:32 | ROOF RECOVER FOURTH BUILDING REVIEW CHECKLIST. | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | 1- OK. | | | | ORIGINAL COMMENT: | | 2- NEED FIELD UPLIFT TESTING TAS 105 AND MOISTURE | | CONTENT TEST TAS 126 (2 COPIES) AS REQUIRED BY NOTE #14 | | ON PAGE 3 OF 67 OF FL16443-R17 FOR RECOVER | | INSTALLATIONS. NOTE: THIS NOTE STATES THAT FOR RECOVER | | INSTALLATIONS, THE EXISTING ROOF SHALL BE EXAMINED IN | | ACCORDANCE WITH FBC 1521. | | THE REQUIRED TESTS ARE TO VERIFY THAT EXISTING ROOF IS | | ADEQUATE FOR RECOVER INSTALLATION. | | | | RESPONSE: | | NEED FIELD UPLIFT TESTING TAS 105 AND MOISTURE CONTENT | | TEST TAS 126. THESE TESTS NEED TO BE DONE BY AN | | APPROVED TESTING AGENCY AND ALL TEST REPORTS, INCLUDING | | CALCULATIONS SHALL BE SIGNED BY A REGISTERED DESIGN | | PROFESSIONAL. SEE SCOPE ON TESTING APPLICATION | | STANDARDS 105 AND 126 RESPECTIVELY. TESTING SUBMITTED | | IS NOT DONE BY AN APPROVED TESTING AGENCY AND IS NOT | | SIGNED BY REGISTERED DESIGN PROFESSIONAL. | | SEC. 107.2.1 CITY AMENDMENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | QUESTIONS REGARDING THESE COMMENTS, | | JULIO GOMEZ | | COMMERCIAL COMBINATION PLANS EXAMINER | | DEVELOPMENT SERVICES DEPARTMENT | | BUILDING DIVISION | | (561)805-6712 | | [email protected] |
|