2020-02-12 10:53:22 | ROOF RECOVER BUILDING REVIEW COMMENTS |
| CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. |
| |
| 1- MAXIMUM DESIGN PRESSURES FOR SELECTED ASSEMBLY SC-95 |
| FROM FLORIDA PRODUCT APPROVAL FL16443-R17 DOESN'T MEET |
| THE DESIGN PRESSURE FOR ALL ROOFF ZONES. SEC. 1609.1 |
| FBC-BUILDING. |
| NEED TO PROVIDE SIGNED AND SEALED RAS 117 CALCULATIONS |
| (2 COPIES) AS REQUIRED BY NOTE#9 ON PAGE 2 OF 67 OF |
| PRODUCT APPROVAL SUBMITTED. |
| |
| 2- NEED FIELD UPLIFT TESTING TAS 124 (2 COPIES) AS |
| REQUIRED BY NOTE #12 ON PAGE 3 OF 67 OF FL16443-R17 |
| FOR BONDED INSULATION OR MEMBRANE OVER EXISTING |
| SUBSTRATES IN A RECOVER INSTALLATION. |
| FAC 61G20-3.001SEC. 1609.1 FBC-BUILDING. |
| |
| 3- NEED FIELD UPLIFT TESTING TAS 105 AND MOISTURE |
| CONTENT TEST TAS 126 (2 COPIES) AS REQUIRED BY NOTE #14 |
| ON PAGE 3 OF 67 OF FL16443-R17 FOR RECOVER |
| INSTALLATIONS. NOTE: THIS NOTE STATES THAT FOR RECOVER |
| INSTALLATIONS, THE EXISTING ROOF SHALL BE EXAMINED IN |
| ACCORDANCE WITH FBC 1521. |
| THE REQUIRED TESTS ARE TO VERIFY THAT EXISTING ROOF IS |
| ADEQUATE FOR RECOVER INSTALLATION. |
| |
| 4-THERE ARE SEVERAL BUILDINGS AND ROOF AREAS IN THIS |
| PROPERTY. PROVIDE SKETCH (2 COPIES) SHOWING THE ROOF |
| AREA WHERE WORK IS GOING TO TAKE PLACE. SEC. 107.2.1 |
| CITY AMENDMENTS. |
| |
| PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| QUESTIONS REGARDING THESE COMMENTS, |
| JULIO GOMEZ |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| DEVELOPMENT SERVICES DEPARTMENT |
| BUILDING DIVISION |
| (561)805-6712 |