2020-02-26 07:42:48 | PLAN |
| REVIEW COMMENTS |
| 2ND REVIEW: FBC SIXTH EDITION (2017) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) THIS MEMBRANE STRUCTURE WILL BE ATTACHED TO AND A |
| PART OF A BUILDING THAT IS OF TYPE IIB CONSTRUCTION AND |
| IS FULLY SPRINKLERED. ACCORDING TO FBC 3102.3, |
| NON-COMBUSTIBLE FRAME STRUCTURES COVERED BY AN APPROVED |
| MEMBRANE IN ACCORDANCE WITH SECTION 3102.3.1 SHALL BE |
| CLASSIFIED AS TYPE IIB CONSTRUCTION. THERE IS AN EXIT |
| PATH OF TRAVEL PASSES THROUGH THIS MEMBRANE STRUCTURE |
| WHICH CONTAINS TABLES AND CHAIRS AND IS A PART OF THE |
| RESTAURANT. FBC SECTION 903.2.1.2 REQUIRES THIS PORTION |
| OF THE BUILDING TO BE FIRE SPRINKLERED. SUBMIT PLANS |
| THAT SHOW COMPLIANCE. |
| |
| 2) THE PLANS INDICATE THAT THE STEEL TRUSSES WILL BE |
| ATTACHED TO WOOD BACKING OR OTHER. IF WOOD BACKING IS |
| USED IT IS REQUIRED TO BE FIRE-RETARDANT-TREATED PER |
| FBC 603.1. |
| |
| 3) THE PLANS STATE THAT THE FABRIC COVERS ARE REQUIRED |
| TO BE REMOVED WHEN WINDSPEEDS ARE EXPECTED TO EXCEED 75 |
| MPH. SPECIFY WHO WILL BE RESPONSIBLE FOR REMOVING THE |
| FABRIC COVERS. SUBMIT TWO SETS OF DETAILED AWNING |
| REMOVAL INSTRUCTIONS WITH PHOTOGRAPHS/DRAWINGS THAT |
| SHOW HOW THIS IS DONE IN TERMS THAT A LAYMAN WILL |
| UNDERSTAND. THESE INSTRUCTIONS ARE TO BE PROVIDED TO |
| THE PROPERTY OWNER, OWNER'S REPRESENTATIVE OR LESSEE. |
| FBC 107.2.1 |
| |
| 4) THE PLANS SHOW FABRIC ROLL UP SIDE PANELS. WILL |
| THESE PANELS BE ROLLED UP AND REMAIN IN PLAN ON THE |
| STRUCTURAL FRAME DURING PERIODS OF HIGH WINDS? IF SO |
| WAS THIS CONSIDERED BY THE ENGINEER WHEN THE WINDLOAD |
| ANALYSIS WAS PREFORMED? FBC 107.2.1 |
| |
| 5) SEPARATE PERMITS WILL BE REQUIRED FOR THE FIRE |
| SPRINKLERS AND THE ELECTRICAL WORK. FBC 105 |
| |
| 6) THE PLANS FOR THE RESTAURANT BUILD OUT, PERMIT # |
| 19110659, STATE THAT THE EXTERIOR CANOPY WILL BE |
| DESIGNED BY A DELEGATE ENGINEER. THE PLANS ARE REQUIRED |
| TO BE REVIEWED AND APPROVED BY THE DESIGNER OF RECORD. |
| A SHOP DRAWING REVIEW STAMP IS REQUIRED ON THE PLANS. |
| FAC 61G15-31.001 |
| |
| 7) SINCE THE MEMBRANE STRUCTURE IS STRUCTURALLY |
| ATTACHED TO THE EXISTING BUILDING. THE EXISTING |
| STRUCTURE NEEDS TO BE EVALUATED TO DETERMINE IF THE |
| ADDITIONAL LOADS ( WINDLOADS, ETC.) FROM THE MEMBRANE |
| STRUCTURE WILL HAVE A NEGATIVE AFFECT ON IT. FBC 1604 |
| |
| 8) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE |
| PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND |
| KEEP THEM WITH THE SUBMITTALS. |
| |
| |
| |
| |