2020-02-07 11:27:54 | BUILDING REVIEW COMMENTS: |
| |
| W.P.B. PERMIT: 19120500 |
| REVIEWED: FEBRUARY 6, 2020 |
| |
| DYLAN BATTLES |
| BUILDING PLANS EXAMINER PX4191 |
| [email protected] |
| 561-805-6718 |
| |
| FLORIDA BUILDING CODE,6TH EDITION (2017) |
| FBC[AMENDED] = 2017 CHAPTER 1 WPB AMENDMENTS (SEE LINK |
| BELOW) |
| HTTPS://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/ |
| BUILDING-PERMIT-FORMS |
| FBC[B] = FBC BUILDING |
| FBC[EXISTING] = FBC EXISTING BUILDING |
| FBC[A] = FBC ACCESSIBILITY |
| FBC[E] = FBC ENERGY CONSERVATION |
| FBC[R] = FBC RESIDENTIAL |
| |
| DUE TO THE FACT THAT THESE STRUCTURES MAY BE |
| RESIDENTIAL AND COMMERCIAL IN NATURE SOME CROSSOVER IN |
| BUILDING CODE REVIEW WILL OCCUR. THE MOST STRINGENT OF |
| THE CODES WILL APPLY. |
| - PLEASE USE CODE REFERENCE IN BRACKETS AT EACH COMMENT |
| AND REFER TO CODE INDEX AT THE TOP OF PAGE FOR THE CODE |
| BOOK WHERE THAT THE COMMENT REFERENCES. |
| 419.1 FBC[B]GENERAL. A LIVE/WORK UNIT SHALL COMPLY WITH |
| SECTIONS 419.1 THROUGH 419.9. |
| - WHILE NOT CLARIFIED FOR THIS PERMIT IF LIVE WORK IS |
| SPECIFIED FOR BUILD OUT PLEASE APPLY CHAPTER 4 SPECIAL |
| REQUIREMENTS. |
| |
| 1) 107.2.5 FBC[AMENDED] DEMOLITION PLAN. |
| - PLEASE PUT FOR REFERENCE ONLY ON DEMO SHEET A1.0D. |
| REMOVAL OF STRUCTURES REQUIRES A SEPARATE DEMOLITION |
| PERMIT THAT HANDLES ALL ASSPECTS OF UTILITY |
| DISCONNECTS. |
| |
| 2) 401.2 FBC[RE] PROVIDE ENERGY CALCULATIONS TO MEET |
| REQUIREMENTS IN R401.2 RESIDENTIAL ENERGY CODE. CHOOSE |
| METHOD IN R401.2 AND SUPPLY DOCUMENTATION. |
| - PLEASE SUPPLY ENERGY CALCULATIONS WITH CHECKLISTS AND |
| EPL CARD. EVEN THOUGH THE PLANS ARE FOR SHELL ONLY, THE |
| THERMAL ENVELOPE NEEDS TO BE COMPLETED BY CHOSEN METHOD |
| AND DOCUMENTS PROVIDED TO SHOW COMPLIANCE. |
| |
| 3) 107.5.3 FBC[AMENDED]ADD SQUARE FOOTAGE OF SPACE |
| UNDER AIR, OUTDOOR DECK SPACE AND TOTAL SPACE FOR THIS |
| BUIL;DING. |
| - SINCE THIS IS SHARED DECK SPLIT THE SQ. FOOTAGE |
| BETWEEN THE BUILDINGS. |
| |
| 4) 107.3.5.3 FBC[AMENDED] PROVIDE SEDIMENT CONTROL TO |
| KEEP CONSTRUCTION DEBRIS FROM ENTERING ADJACENT |
| PROPERTIES AND STORM DRAINS DURING CONSTRUCTION. YOU |
| CAN JUST ADD SILT FENCE DETAIL AND HOW DRAINS ARE |
| PROTECTED TO THE DRAINAGE PLAN. SOME ENGINEERING |
| STANDARD DETAILS CAN BE USED FROM WPB WEBSITE-POLLUTION |
| CONTROL. HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUB |
| LIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| |
| 5) [FBC 107.5][FBC 110.9][FBC R401.3]SHEET C503 FOR |
| DRAINAGE SHOWS THE STUCTURES TO BE PLACED ON PADS. |
| PLEASE ADJUST DRIANAGE PLAN TO ACCOUNT FOR STRUCTURES |
| TO BE BUILT ON RAISED PIERS. SHOW HOW WATER WILL BE |
| KEPT AWAY FROM THE CRAWL SPACE AND HOW DRAINAGE WORK |
| BETWEEN STRUCTURES AS WATER DRAINS THROUGH THE DECK. |
| |
| 6) 408.1 FBC[R] VENTILATION. THE UNDER-FLOOR SPACE |
| BETWEEN THE BOTTOM OF THE FLOOR JOISTS AND THE EARTH |
| UNDER ANY BUILDING (EXCEPT SPACE OCCUPIED BY A |
| BASEMENT) SHALL HAVE VENTILATION OPENINGS THROUGH |
| FOUNDATION WALLS OR EXTERIOR WALLS. |
| - THERE IS PLENTY OF VENTILATION, BUT TYPICALLY THE |
| OPENINGS FOLLOW R408.1 WHERE IT STATES THAT OPENINGS |
| ARE TO BE COVERED WITH MATERIAL PROVIDED THAT THE LEAST |
| DIMENSION SHALL NOT EXCEED 1/4 INCH. |
| |
| 7) 408.4 FBC[R] ACCESS TO UNDER FLOOR SPACE. ACCESS |
| OPENINGS THROUGH THE FLOOR SHALL BE A MINIMUM OF 18 |
| INCHES BY 24 INCHES. OPENINGS THROUGH A PERIMETER WALL |
| SHALL BE NOT LESS THAN 16 INCHES BY 24 INCHES. |
| - PLEASE INDICATE WHERE ACCESS WILL BE PROVIDED. |
| |
| 8) PROVIDE DOCUMENTATION OF UNDER FLOOR INSULATION. |
| DOES IT PROVIDE VAPOR BARRIER? |
| |
| 9) F101.6 FBC[B]APPENDIX F. PIER AND WOOD CONSTRUCTION. |
| F101.6.1 SILL LESS THAN 12 INCHES ABOVE GROUND. |
| BUILDINGS NOT PROVIDED WITH A CONTINUOUS FOUNDATION |
| SHALL BE PROVIDED WITH PROTECTION AGAINST RODENTS AT |
| GRADE BY PROVIDING EITHER AN APRON IN ACCORDANCE WITH |
| SECTION F101.6.1.1 OR A FLOOR SLAB IN ACCORDANCE WITH |
| SECTION F101.6.1.2. F101.6.1.1 APRON. WHERE AN APRON IS |
| PROVIDED, THE APRON SHALL BE NOT LESS THAN 8 INCHES |
| (203 MM) ABOVE, NOR LESS THAN 24 INCHES (610 MM) BELOW, |
| GRADE. THE APRON SHALL NOT TERMINATE BELOW THE LOWER |
| EDGE OF THE SIDING MATERIAL. THE APRON SHALL BE |
| CONSTRUCTED OF AN APPROVED NONDECAYABLE, |
| WATER-RESISTANT RODENTPROOFING MATERIAL OF REQUIRED |
| STRENGTH AND SHALL BE INSTALLED AROUND THE ENTIRE |
| PERIMETER OF THE BUILDING. WHERE CONSTRUCTED OF MASONRY |
| OR CONCRETE MATERIALS, THE APRON SHALL BE NOT LESS THAN |
| 4 INCHES (102 MM) IN THICKNESS. |
| - THE PROPOSED LATTICE AT THE UNDER FLOOR AREAS WOULD |
| CREATE ACCESS FOR CRITTERS TO THE UNDERSIDE OF |
| STRUCTURE AND EXPOSED INSULATION. PLEASE REVIEW |
| REQUIRMENTS FOR VENTILATION AND APPENDIX F FOR RODENT |
| PROOFING. |
| |
| 10) 105.10 FBC[B]CERTIFICATE OF PROTECTIVE TREATMENT |
| FOR PREVENTION OF TERMITES. A WEATHER-RESISTANT |
| JOB-SITE POSTING BOARD SHALL BE PROVIDED TO RECEIVE |
| DUPLICATE TREATMENT CERTIFICATES AS EACH REQUIRED |
| PROTECTIVE TREATMENT IS COMPLETED, PROVIDING A COPY FOR |
| THE PERSON THE PERMIT IS ISSUED TO AND ANOTHER COPY FOR |
| THE BUILDING PERMIT FILES. THE TREATMENT CERTIFICATE |
| SHALL PROVIDE THE PRODUCT USED, IDENTITY OF THE |
| APPLICATOR, TIME AND DATE OF THE TREATMENT, SITE |
| LOCATION, AREA TREATED, CHEMICAL USED, PERCENT |
| CONCENTRATION AND NUMBER OF GALLONS USED, TO ESTABLISH |
| A VERIFIABLE RECORD OF PROTECTIVE TREATMENT. IF THE |
| SOIL CHEMICAL BARRIER METHOD FOR TERMITE PREVENTION IS |
| USED, FINAL EXTERIOR TREATMENT SHALL BE COMPLETED PRIOR |
| TO FINAL BUILDING APPROVAL. |
| - NO NOTES FOUND ON PLAN ABOUT TERMITE TREATMENT. |
| PLEASE ADD OR LET ME KNOW WHAT SHEET THEY ARE LOCATED |
| ON. |
| |
| 105.11 FBC[B]NOTICE OF TERMITE PROTECTION. A PERMANENT |
| SIGN WHICH IDENTIFIES THE TERMITE TREATMENT PROVIDER |
| AND NEED FOR REINSPECTION AND TREATMENT CONTRACT |
| RENEWAL SHALL BE PROVIDED. THE SIGN SHALL BE POSTED |
| NEAR THE WATER HEATER OR ELECTRIC PANEL. |
| - NO NOTES FOUND ON PLAN ABOUT TERMITE TREATMENT. |
| PLEASE ADD OR LET ME KNOW WHAT SHEET THEY ARE LOCATED |
| ON. |
| |
| 1816.1 FBC[B]TERMITE PROTECTION. TERMITE PROTECTION |
| SHALL BE PROVIDED BY REGISTERED TERMITICIDES, INCLUDING |
| SOIL APPLIED PESTICIDES, BAITING SYSTEMS, AND |
| PESTICIDES APPLIED TO WOOD, OR OTHER APPROVED METHODS |
| OF TERMITE PROTECTION LABELED FOR USE AS A PREVENTATIVE |
| TREATMENT TO NEW CONSTRUCTION. SEE SECTION 202, |
| ?REGISTERED TERMITICIDE.? UPON COMPLETION OF THE |
| APPLICATION OF THE TERMITE PROTECTIVE TREATMENT, A |
| CERTIFICATE OF COMPLIANCE SHALL BE ISSUED TO THE |
| BUILDING DEPARTMENT BY THE LICENSED PEST CONTROL |
| COMPANY THAT CONTAINS THE FOLLOWING STATEMENT: ?THE |
| BUILDING HAS RECEIVED A COMPLETE TREATMENT FOR THE |
| PREVENTION OF SUBTERRANEAN TERMITES. TREATMENT IS IN |
| ACCORDANCE WITH RULES AND LAWS ESTABLISHED BY THE |
| FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER |
| SERVICES.? |
| |
| 11) 806.5 FBC[R] UNVENTED ATTIC AND UNVENTED ENCLOSED |
| RAFTER ASSEMBLIES. 5.1.2. WHERE AIR-PERMEABLE |
| INSULATION IS PROVIDED INSIDE THE BUILDING THERMAL |
| ENVELOPE, IT SHALL BE INSTALLED IN ACCORDANCE WITH |
| SECTION 5.1.1. IN ADDITION TO THE AIR-PERMEABLE |
| INSULATION INSTALLED DIRECTLY BELOW THE STRUCTURAL |
| SHEATHING, RIGID BOARD OR SHEET INSULATION SHALL BE |
| INSTALLED DIRECTLY ABOVE THE STRUCTURAL ROOF SHEATHING |
| IN ACCORDANCE WITH THE R-VALUES IN TABLE R806.5 FOR |
| CONDENSATION CONTROL. |
| - PLEASE REVIEW THIS SECTION FOR AIR PERMEABLE |
| INSULATION AT ROOF DECK FOR CONDENSATION CONTROL. ALSO, |
| PROVIDE R-VALUE OF ALL INSULATION IN ENERGY CALCULATION |
| DOCUMENTS. |
| |
| 12) 905.1.1 FBC[R] ASPHALT SHINGLES SHALL BE USED ONLY |
| ON ROOF SLOPES OF TWO UNITS VERTICAL IN 12 UNITS |
| HORIZONTAL (2:12) OR GREATER |
| |
| 905.2.2 FBC[R] & 905.1.1 FBC[R] FOR ROOF SLOPES FROM |
| TWO UNITS VERTICAL IN 12 UNITS HORIZONTAL (2:12) AND |
| LESS THAN FOUR UNITS VERTICAL IN 12 UNITS HORIZONTAL |
| (4:12), DOUBLE UNDERLAYMENT APPLICATION IS REQUIRED. |
| - PLEASE ADD NOTE FOR DOUBLE UNDERLAYMENT. |
| |
| 13) 1507.1.1 FBC[B]UNDERLAYMENT. UNLESS OTHERWISE |
| NOTED, UNDERLAYMENT FOR ASPHALT SHINGLES, METAL ROOF |
| PANELS, METAL ROOF SHINGLES, MINERAL SURFACED ROLL |
| ROOFING, SLATE SHINGLES, WOOD SHINGLES, AND WOOD SHAKES |
| SHALL CONFORM TO THE APPLICABLE STANDARDS LISTED IN |
| THIS CHAPTER. UNDERLAYMENT MATERIALS REQUIRED TO COMPLY |
| WITH ASTM D226, D1970, D4869 AND D6757 SHALL BEAR A |
| LABEL INDICATING COMPLIANCE TO THE STANDARD DESIGNATION |
| AND, IF APPLICABLE, TYPE CLASSIFICATION INDICATED IN |
| TABLE 1507.1.1. UNDERLAYMENT SHALL BE APPLIED AND |
| ATTACHED IN ACCORDANCE WITH TABLE 1507.1.1. |
| - SHEET A4.0 CALLS FOR 15# FELT. PLEASE PROVIDE |
| DOCUMENTATION THAT 15# COMPLIES WITH 1507.1.1. OR |
| REMOVE NOTE AND SUPPLY UNDERLAYMENT PRODUCT APPROVAL |
| WITH ROOFING SUB PERMIT. |
| |
| 14) 107.3.4.1 FBC[AMENDED] PROVIDE PRODUCT APPROVALS |
| FOR ROOFING, OR INDICATE THAT YOU WOULD LIKE THEM |
| DEFERRED. |
| |
| 15) PLEASE ADJUST ROOFING WIND DIAGRAMS ON SHEET S-1 TO |
| MEET ASCE 7-10 TABLE 30.7.2. TYPICAL ROOF ZONE FOR |
| GABLE END WOULD INCLUDE ZONE 2 AT RIDGE. ALSO, TWO ROOF |
| TYPES ARE BEING UTILIZED SO ADD SHED ROOF DIAGRAM SINCE |
| ZONE 3 HAS UNIQUE REQUIREMENTS. |
| - THIS PERMIT IS FOR THE SHED TYPE ROOF, BUT SINCE BOTH |
| BUILDING TYPES ARE SHOWN ON PLANS YOU SHOULD SHOW BOTH. |
| |
| 16) 107.5.3 FBC[AMENDED]I FOUND ROOF PITCH ON THE ROOF |
| PLAN, BUT IT WOULD BE GOOD TO HAVE THE PITCH SHOWN IN |
| ELEVATION OR SECTION AS WELL. |
| |
| PROVISOS: |
| A) DEMOLITION OF STRUCTURES TO BE DONE UNDER SEPARATE |
| DEMOLITION PERMIT. IF NOT AVAILABLE AT WEBSITE HTTPS:// |
| WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-SERVICES/FORMS |
| PLEASE REQUEST VIA E-MAIL [email protected] |
| B) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE |
| REQUIRED FOR: SIGNAGE, LIGHT POLES/SITE LIGHTING , |
| LANDSCAPING, IRRIGATION, FENCING AND PAVERS. |
| C) SUBMIT TRUSS SHOP DRAWINGS TO THE BUILDING INSPECTOR |
| PRIOR TO INSTALLATION. 107.3.4.1 FBC[AMENDED] |
| D) DEFERRED SUBMITTALS: PROVIDE PRODUCT APPROVALS FOR |
| WNDOWS, DOORS. |
| ENGINEERING FOR HANDRAILS AND GUARDRAILS. |
| E) NO CERTIFICATE OF OCCUPANCY CAN BE ISSUED FOR THIS |
| STRUCTURE UNTIL OCCUPANCY IS DETERMINED AND INTERIOR |
| BUILD OUT IS COMPLETE. |
| F) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM |
| SAT-SUN |
| - NO RESPONSE REQUIRED. THESE WILL BE ADDED TO THE |
| PLANS AT FINAL STAMPING. |
| |
| PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW |
| EACH COMMENT IS BEING ADDRESSED. |
| |
| PLEASE FEEL FREE TO CONTACT ME AT 561-805-6718 (M-F |
| 8-5) TO DISCUSS COMMENTS, OR E-MAIL ANYTIME |
| [email protected] |
| |
| |
| |