2020-05-15 14:53:45 | PROVISOS: | | PROVIDE ELEVATION CERTIFICATE WHILE UNDER CONSTRUCTION. | | PROVIDE FORMBOARD SURVEY TO INSPECTOR PRIOR TO POURING | | FOUNDATION. | 2019-12-02 07:44:07 | PROVISOS: | | 1) SEE DEFERRED SUBMITTALS LIST ON SHEET LS-0 | | 2) AIPP COMPLIANCE REQUIRED; VERIFICATION REQUIRED | | PRIOR TO C.O. | | CONTACT WITHIN 90 DAYS OF PERMIT ISSUANCE. | | 3) SHORING/RESHORE ENGINEERING IS REQUIRED TO BE | | SUBMITTED TO THE BUILDING DIVISION FOR REVIEW. THE | | ENGINEERING IS TO BE SUBMITTED, REVIEWED AND ISSUED | | PRIOR TO CONCRETE POUR. | | 4) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE | | REQUIRED FOR: | | LIGHT POLES/SITE LIGHTING | | FIRE ALARM | | FIRE SPRINKLER | | LOW VOLTAGE | | ACCESS | | LANDSCAPING | | IRRIGATION | | PARKING LOT | | ALL OTHER ITEMS OTHER THAN BMEP | | 5) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM | | SAT-SUN | | 6) FLOORING SUBMITTAL WITH SOUND IIC, STC AND FIRE | | RATINGS. | | 7) SUBMITTAL FOR VEHICLE BARRIER SYSTEM | | 8) SUBMITTAL FOR HAND RAILS AND GUARD RAILS | | 9) ROOFING PRODUCT APPROVALS AND ENGINEERING AT TIME OF | | SUB-PERMIT APPLICATION. | | 10) ROOF TRUSS SHOP DRAWINGS TO INSPECTOR PRIOR TO | | INSTALL. | | |
|