Date |
Text |
2020-01-11 10:52:49 | PLAN REVIEW - BUILDING |
| |
| CODES IN EFFECT: |
| 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| FBC RE = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION |
| FBC CE = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 |
| 6TH EDITION |
| |
| CHRISTOPHER S. THROOP, C.B.O. |
| BUILDING PLANS EXAMINER, PX3169 |
| 1&2 FAMILY PLANS EXAMINER, SFP306 |
| CONSTRUCTION SERVICES DIVISION |
| TEL: 561-805-6726 |
| FAX: 561-805-6676 |
| E-MAIL: [email protected] |
| |
| 2ND REVIEW |
| |
| RESULTS: DENIED |
| |
| YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED |
| BELOW. |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| |
| 1. VALUE HAS BEEN ADJUSTED FROM $85,000 TO $180,405 |
| BASED ON THE ICC BUILDING VALUATION TABLES. 1488 SQ FT |
| X $121.24/SQ FT = $180,405. |
| |
| CITY OF WPB CHPT. 1 VALUE 109.3 BUILDING PERMIT |
| VALUATIONS. |
| |
| 2. DESIGNER OF RECORD (DOR) STATES VALUE IS OVER |
| ESTIMATED FOR THIS NEIBORHOOD. ADJUSTMENTS TO VALUE ARE |
| OUT OF PLANS EXAMINERS PERVIEW. |
| |
| 3. DOR MAY SUBMIT ADJUSTMENT REQUEST ON COMPANY |
| LETTERHEAD TO MR. ROBERT BROWN, BUILDING OFFICIAL, CITY |
| OF WEST PALM BEACH, FL 33401. LETTER MUST BE ORIGINAL |
| SIGNED AND SEALED BY DOR. |
| |
| 4. SUBMIT PRODUCT APPROVALS FOR PROPOSED WINDOWS, DOORS |
| AND ROOFING SYSTEM COMPONENTS. INCLUDE PRODUCT APPROVAL |
| COVER LETTER AND INSTALLATION INSTRUCTIONS FOR SPECIFIC |
| MODEL/PRODUCTS SELECTED. |
| |
| FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE |
| PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED |
| AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| SPECIFICALLY, PROVIDE ROOFING, WINDOW AND DOOR |
| SUBMITTALS. |
| |
| DEFERAL OF PRODUCT APPROVALS MAY BE SELECTED. SEE |
| BELOW. |
| |
| 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| THE DEFERRED SUBMITTALS ON |
| THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE BUILDING |
| OFFICIAL. |
| DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| OFFICIAL. |
| |
| IF DEFERAL OPTION IS SELECTED, PROVIDE LIST OF PRODUCTS |
| TO BE DEFERRED ON PLANS. I.E. WINDOWS, DOORS, ROOFING |
| |
| |
| |
| |
| |
| |