2019-11-18 16:34:16 | 11/18/2019 1ST PLUMBING/POOL REVIEW **DENIED** WITH |
| COMMENTS |
| |
| NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| |
| 1. SUBMIT DOCUMENTATION THAT THE GAS POOL HEATER MEETS |
| THE MINIMUM REQUIRED EFFICIENCY AS REQUIRED BY THE 2017 |
| FBC-ENERGY SEC.R403.10.4. THE POOL HEATER SHALL HAVE A |
| MINIMUM THERMAL EFFICIENCY OF 82% PER THE 2017 |
| FBC-ENERGY SEC. R403.10.4. |
| |
| 2. HEATED SWIMMING POOLS AND INGROUND PERMANENTLY |
| INSTALLED SPAS SHALL BE EQUIPPED WITH A VAPOR-RETARDANT |
| COVER ON OR AT THE WATER SURFACE OR A LIQUID COVER OR |
| OTHER MEANS PROVEN TO REDUCE HEAT LOSS. 2017 FBC- |
| ENERGY- SEC. R 403.10.3. |
| |
| 3. SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. |
| IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC |
| TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS |
| NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH |
| CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, |
| 4.4.9.1. |
| |
| 4. REDUCED PRESSURE ZONE BACKFLOW (RPZ) REQUIRED AT |
| WATER METER WITH PERMIT AND CERTIFIED BY UTILITIES. A |
| SECOND PRESSURE VACUUM BACKFLOW (PVB TO BE CERTIFIED BY |
| PLUMBING CONTRACTOR) IS REQUIRED ON THE AUTOFILL PER |
| THE2017 FBC-PLUMBING SEC.608.1. |
| |
| 5. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE PUMP |
| PER THE WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| |
| 6. SUBMIT CLEAR AND LEGIBLE SPECIFICATIONS FOR THE |
| CARTRIDGE FILTER PER THE WPB AMEND. TO FBC SEC. |
| 107.2.1. |
| |
| 7. THE CLAIMED VALUE APPEARS TO BE UNDERESTIMATED ON |
| THE APPLICATION, PLEASE PROVIDE A BONA FIDE SIGNED |
| CONTRACT PER THE WPB AMENDMENTS TO THE FBC SEC. 109.3 |
| BUILDING PERMIT VALUATIONS. |
| |
| 8. THERE IS NO VALUE LISTED ON THE PLUMBING |
| SUB-APPLICATION AND THE OVERALL VALUE IS LOW. WPB |
| AMENDMENTS TO THE FBC 109.3 BUILDING PERMITS |
| VALUATIONS. IF IN THE OPINION OF THE BUILDING OFFICIAL, |
| THE CLAIMED VALUATION OF BUILDING, ALTERATION, |
| STRUCTURE, ELECTRICAL, GAS, MECHANICAL OR PLUMBING |
| SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE |
| APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE |
| APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR |
| BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO |
| MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR |
| PERMITTING PURPOSES, THE VALUATION OF BUILDINGS AND |
| SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE |
| STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, INTERIOR |
| FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN |
| FEES, MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION COST |
| ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS |
| PUBLISHED BY INTERNATIONAL CODE CONGRESS. FINAL |
| BUILDING PERMIT VALUATION SHALL BE SET BY THE BUILDING |
| OFFICIAL. |
| |
| WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| LUIS A. CRESPO |
| PLUMBING INSPECTOR / |
| PLUMBING PLAN REVIEW |
| AVAILABLE FROM 6:30 AM 7:30 / 2:00 PM TO 5:00 PM |
| [email protected] |
| 561-701-6437 |
| |