2019-11-13 06:59:19 | 11/13/2019 1ST PLUMBING/POOL REVIEW **DENIED** WITH |
| COMMENTS NOTE - A COMPREHENSIVE REVIEW COULD NOT BE |
| DONE AT THIS TIME AND ADDITIONAL PLAN REVIEW COMMENTS |
| MAY BE GENERATED UPON THE RE-REVIEW OF SUBMITTED |
| CORRECTIONS. |
| |
| 1- SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN |
| DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER |
| ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 |
| EDITION ADDRESSES FLOW RATE IN GALLONS PER MINUTE |
| (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE |
| DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE |
| SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH |
| CALCULATIONS MUST INCLUDE ALL OF THE SYSTEM COMPONENTS |
| INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, |
| HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS |
| EXCEPT THE PUMP. |
| |
| 2-INDICATE ON THE POOL PUMP SPECS WHICH PUMP IS BEING |
| INSTALLED. WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| |
| 3-IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS |
| SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS |
| IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE |
| TDH CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, |
| 4.4.9.1. |
| |
| 4-SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN |
| DRAIN. WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| |
| 5- WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION |
| & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| COOPERATION. |
| |
| ATELYO BELISLE |
| PLUMBING INSPECTOR / |
| PLUMBING PLAN REVIEW |
| AVAILABLE FROM 1:00 PM TO 4:00 PM |
| [email protected] |
| 561-805-6695 |
| |