Date |
Text |
2019-10-24 14:46:41 | CODES IN EFFECT: |
| FBC = FLORIDA BUILDING CODE 2017 6TH EDITION |
| WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| 6TH ED, CHAPTER 1. |
| WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| MANUAL REVISED 2017 |
| FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 |
| 6TH EDITION |
| FBC RES = FLORIDA RESIDENTIAL CODE 2017 6TH EDITION |
| FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION |
| FBC EX = FLORIDA EXISTING BUILDING CODE 2017 6TH |
| EDITION |
| FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION |
| FBC FG = FLORIDA FUEL GAS CODE 2017 6TH EDITION |
| NFPA 54 = NATIONAL FUEL GAS CODE |
| NFPA 58 = LIQUIFIED PETROLEUM GAS CODE |
| NFPA 96 = STANDARD FOR VENTILATION CONTROLAND FIRE |
| PROTECTION OF COMMERCIAL COOKING OPERATIONS 2017 |
| NFPA 99 = HEALTH CARE FACILITIES CODE |
| NFPA 99B = STANDARD FOR HYPERBARIC FACILITIES |
| FAC= FLORIDA ADMINISTRATIVE CODE |
| FS = FLORIDA STATUTES |
| |
| |
| 1ST REVIEW |
| PLUMBING COMMENTS: DENIED |
| PER WPB FBC 107.2.1 AND 107.3.5.3 (12), PROVIDE A |
| PLUMBING (SANITARY) RISER DIAGRAM FOR THE NEW |
| BATHROOMS. |
| |
| |
| END OF COMMENTS. |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| THE PREVIOUSLY REVIEWED SHEETS.ALL PLANS TO BE SIGNED |
| AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS. |
| |
| |
| |
| |
| JERALD SMITH |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| EMAIL [email protected] |
| PHONE 561-805-6715 |
| |
| 19100910 719 9TH ST |
| |