Date Text
2019-10-21 14:04:1510/21/2019 1ST GAS/LP/TANK REVIEW **DENIED** WITH
 COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE PROVIDE MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR AND THEY SHALL BE ONSITE FOR FINAL GAS
 INSPECTION. THE GENERATOR SHALL BE LISTED AND APPROVED.
 NFPA 58 SEC. 5.20.1. THE GENERATOR SHALL MEET THE
 REQUIREMENTS OF UL 2200.
  
 2. PLEASE CLARIFY IF CABLE IS PROTECTED FOR THE LP TANK
 AND APPURTENANCES AND WHAT ARE YOU GOING TO USE TO DO
 SO PER NFPA 58. WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 3. SHOW THE DEPTH OF THE LP GAS CONTAINER BELOW GRADE.
 COMPLY WITH NFPA 58 SEC. 6.6.6.1.
  
 4. FOR CATHODIC PROTECTION PLEASE SHOW SIZE (LBS.) & A
 NUMBER OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE CABLE,
 HOW IS IT GOING TO BE ACTIVATED (EXAMPLE WATER) PER
 NFPA 58 SEC. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE
 MONITORED PER NFPA 58 SEC.6.6.6.1 (J).
  
 5. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1? OF
 EITHER SIDE PER THE 2017 FBC RES. SEC G2421.2 OR 2017
 FBC FG SEC 410.2.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved