2020-06-15 12:39:24 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| |
| 1) THERE IS NO CERTIFICATE OF FLAME RESISTANCE ATTACHED |
| FOR VERIFICATION AND CONFIRMATION OF LISTED PRODUCT PER |
| NFPA |
| |
| 25.2.2 FLAME PROPAGATION PERFORMANCE. |
| 25.2.2.1 ALL TENT FABRIC SHALL MEET THE FLAME |
| PROPAGATION |
| PERFORMANCE CRITERIA CONTAINED IN TEST METHOD 2 OF NFPA |
| 701, |
| STANDARD METHODS OF FIRE TESTS FOR FLAME PROPAGATION OF |
| TEXTILES |
| AND FILMS. [101: 11.11.2.1] |
| 25.2.2.2 ONE OF THE FOLLOWING SHALL SERVE AS EVIDENCE |
| THAT THE TENT |
| FABRIC MATERIALS HAVE THE REQUIRED FLAME PROPAGATION |
| PERFORMANCE: |
| (1) THE AHJ SHALL REQUIRE A CERTIFICATE OR OTHER |
| EVIDENCE OF |
| ACCEPTANCE BY AN ORGANIZATION ACCEPTABLE TO THE AHJ. |
| (2) THE AHJ SHALL REQUIRE A REPORT OF TESTS MADE BY |
| OTHER |
| INSPECTION AUTHORITIES OR ORGANIZATIONS ACCEPTABLE TO |
| THE |
| AHJ. [101: 11.11.2.2] |
| |
| PLEASE REVIEW AND PROVIDE THE CERTIFICATION SHEET. |
| |
| |
| |
| 2) THERE ARE NO CANOPY FRAME DESIGN SPECIFICATIONS |
| PROVIDED. |
| |
| NFPA |
| |
| 1.7.12 PLANS AND SPECIFICATIONS. |
| 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| PLANS AND |
| SPECIFICATIONS TO ENSURE COMPLIANCE WITH APPLICABLE |
| CODES AND |
| STANDARDS. |
| |
| PLEASE PROVIDE THE CANOPY FRAME SPECIFICATIONS. |
| |
| |
| |
| |
| 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| |
| 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |