Plan Review Notes
Plan Review Notes For Permit 19100169
Permit Number 19100169
Review Stop P
Sequence Number 3
Notes
Date Text
2020-02-03 15:07:1102/03/20 3RD PLUMBING REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THRID REQUEST PLEASE SUBMIT A SANITARY RISER DIAGRAM
 FOR ALL CHANGES BEING MADE TO THE PLUMBING SYSTEM PER
 THE WPB AMEND. TO FBC SEC. 107.3.5.3.
 2. THIRD REQUEST, THE WASHING MACHINE STANDPIPE SHALL
 CONNECT TO A 3 INCH OR LARGER DIAMETER FIXTURE BRANCH
 OR STACK PER THE 2017 FBC-PLUMBING SEC.406.2 AND
 MANUFACTURES SPECIFICATION.
 3. THE SHUT OFF VALVES FOR STACKABLE WASHING MACHINE
 SHALL BE ACCESSIBLE WITHOUT MOVING MACHINE PER THE 2017
 FBC PL 606.3.
  
 NEW COMMENT: A PLUMBER MAY SUBMIT AN ISOMETRIC DRAWING
 FOR COMMENT ONE AND ADDRESS COMMENT TWO IN THE DRAWING.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved