Plan Review Notes For Permit 19090705 |
Permit Number |
19090705 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2019-09-20 07:11:37 | 09/20/2019 1ST GAS REVIEW **DENIED** WITH COMMENTS | | | | NOTE: A FULL AND COMPREHENSIVE PLAN REVIEW COULD NOT BE | | ACCOMPLISHED AT THIS TIME DUE TO THE QUALITY OF THE | | SUBMITTED PLANS. ADDITIONAL COMMENTS MAY BE GENERATED | | ON THE RESUBMITTAL REVIEW. | | | | 1. PROVIDE MANUFACTURES SPECIFICATION FOR GENERATOR, | | GAS APPLIANCES SHALL BE LISTED AND LABELED. THE | | INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT | | SHALL BE ONSITE AT THE TIME OF INSPECTION PER THE FBC | | RES. SEC. G2413.2 AND G2404.3. | | | | 2. SHOW DRIP LEG ON EQUIPMENT, IF INSTALLED INSIDE | | GENERATOR PLEASE NOTE ON ISOMETRIC PER THE 2017 FBC | | RES. SEC. G2419.2 OR 2017 FBC FG 408.2. | | | | 3. AN ELECTRICAL PERMIT IS REQUIRED FOR THE GENERATOR | | BY A LICENSED CONTRACTOR PER THE WPB AMENDMENTS TO THE | | FBC SEC. 105.1. | | | | | | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & | | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | COOPERATION. | | | | LUIS A. CRESPO | | PLUMBING INSPECTOR / | | PLUMBING PLAN REVIEW | | AVAILABLE FROM 1:00 PM TO 4:00 PM | | [email protected] | | |
|